  "name": "Industrial lead times",
  "url": "https://industrialleadtimes.com/",
  "license": "CC BY 4.0",
  "licenseNote": "CC BY 4.0 covers our compilation and our own fields. Third-party excerpts and source documents figures stay with their publishers; check their terms before reuse.",
  "cite": "Industrial Lead Times, https://industrialleadtimes.com/",
  "updated": "2026-11-28",
  "fields": [
    {
      "key": "period",
      "label": "Reading period",
      "type": "string",
      "description": "Date or reporting period given by the publisher."
    },
    {
      "key": "category",
      "label": "Category",
      "type": "string",
      "description": "Product category used by the tracker."
    },
    {
      "key": "specification",
      "label": "Scope",
      "type": "string",
      "description": "Product and configuration covered by the reading."
    },
    {
      "key": "publisher",
      "label": "Publisher",
      "type": "string",
      "description": "Organization that disclosed the lead time."
    },
    {
      "key": "basis",
      "label": "Reading type",
      "type": "string",
      "description": "Kind of evidence behind the lead time.",
      "filterable": true
    },
    {
      "key": "clock",
      "label": "Lead-time basis",
      "type": "string",
      "description": "The interval or milestone covered by the reading."
    },
    {
      "key": "duration",
      "label": "Lead time as stated",
      "type": "string",
      "description": "Source duration with original units preserved."
    },
    {
      "key": "weeks_low",
      "label": "Weeks from",
      "type": "number",
      "description": "Lower end in weeks. Exact readings have equal lower and upper values."
    },
    {
      "key": "weeks_high",
      "label": "Weeks to",
      "type": "number",
      "description": "Upper end in weeks. Open-ended readings have an empty upper value."
    },
    {
      "key": "quote",
      "label": "Source excerpt",
      "type": "string",
      "description": "Verbatim excerpt with layout whitespace normalized."
    },
    {
      "key": "source_locator",
      "label": "Source location",
      "type": "string",
      "description": "Page, section, bid item or column to inspect."
    },
    {
      "key": "quoted_cell",
      "label": "Quoted table value",
      "type": "string",
      "description": "Exact lead-time cell where the excerpt is a separate table heading or item label."
    },
    {
      "key": "product_family",
      "label": "Technical family",
      "type": "string",
      "description": "Independent technical reference matched on product family."
    },
    {
      "key": "technical_excerpt",
      "label": "Technical excerpt",
      "type": "string",
      "description": "Verbatim evidence from the technical reference."
    },
    {
      "key": "lead_band",
      "label": "Lead-time band",
      "type": "string",
      "description": "Planning band computed from the lower bound in weeks.",
      "filterable": true
    },
    {
      "key": "range_width",
      "label": "Range width",
      "type": "number",
      "description": "Upper minus lower bound in weeks."
    },
    {
      "key": "duration_type",
      "label": "Duration format",
      "type": "string",
      "description": "Classifies the published bounds as a single duration, bounded range or lower bound only."
    }
  ],
  "records": [
    {
      "id": "georgetown-16-inch-ball-commitment",
      "name": "16-inch metal-seated ball valve via TIPS contract",
      "url": "https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf",
      "summary": "32–36 weeks for 16-inch metal-seated ball valve via TIPS contract. City of Georgetown, Texas reports this as delivery commitment evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2023-10-12",
        "category": "Valves",
        "specification": "16-inch metal-seated ball valve via TIPS contract",
        "publisher": "City of Georgetown, Texas",
        "basis": "Delivery commitment",
        "clock": "Contract delivery",
        "duration": "32–36 weeks",
        "weeks_low": 32,
        "weeks_high": 36,
        "quote": "the manufacturer has committed to delivering the valve in 32-36 weeks.",
        "source_locator": "Parkside–Round Rock interconnect",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 4,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf",
          "title": "City of Georgetown, Texas · Parkside–Round Rock interconnect",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "calnext-5hp-ie3",
      "name": "5 hp IE3 premium-efficiency motor",
      "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
      "summary": "2 weeks for 5 hp IE3 premium-efficiency motor. CalNEXT reports this as supplier benchmark evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2025-01-02",
        "category": "Motors",
        "specification": "5 hp IE3 premium-efficiency motor",
        "publisher": "CalNEXT",
        "basis": "Supplier benchmark",
        "clock": "Equipment lead time",
        "duration": "2 weeks",
        "weeks_low": 2,
        "weeks_high": 2,
        "quote": "IE3 motor with a lead time of roughly two weeks.",
        "source_locator": "Final report, p. 13",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "Under 4 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
          "title": "CalNEXT · Final report, p. 13",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flender-perforated-disc-actual",
      "name": "665 mm forged steel disc for Flender",
      "url": "https://siderforgerossi.com/fast-track-flender-project/",
      "summary": "4 weeks for 665 mm forged steel disc for Flender. Siderforgerossi Group reports this as reported delivery evidence.",
      "tags": [
        "Forgings"
      ],
      "fields": {
        "period": "2026-09-14",
        "category": "Forgings",
        "specification": "665 mm forged steel disc for Flender",
        "publisher": "Siderforgerossi Group",
        "basis": "Reported delivery",
        "clock": "Fast-track delivery",
        "duration": "4 weeks",
        "weeks_low": 4,
        "weeks_high": 4,
        "quote": "was delivered in 4 weeks, achieving a 50% reduction in standard delivery time",
        "source_locator": "Flender case study",
        "quoted_cell": null,
        "product_family": "Forged metal components",
        "technical_excerpt": "Forging entails shaping metal using compressive forces from a press.",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://siderforgerossi.com/fast-track-flender-project/",
          "title": "Siderforgerossi Group · Flender case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://web-assets.bcg.com/pdf-src/prod-live/fixing-aerospaces-supply-chain-for-casting-and-forging.pdf",
          "title": "BCG overview of the forging process",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flender-perforated-disc-standard",
      "name": "665 mm forged steel disc for Flender, standard",
      "url": "https://siderforgerossi.com/fast-track-flender-project/",
      "summary": "8 weeks for 665 mm forged steel disc for Flender, standard. Siderforgerossi Group reports this as supplier benchmark evidence.",
      "tags": [
        "Forgings"
      ],
      "fields": {
        "period": "2026-09-14",
        "category": "Forgings",
        "specification": "665 mm forged steel disc for Flender, standard",
        "publisher": "Siderforgerossi Group",
        "basis": "Supplier benchmark",
        "clock": "Standard delivery",
        "duration": "8 weeks",
        "weeks_low": 8,
        "weeks_high": 8,
        "quote": "4 weeks instead of 8: a 50% reduction in standard delivery time",
        "source_locator": "Flender case study",
        "quoted_cell": null,
        "product_family": "Forged metal components",
        "technical_excerpt": "Forging entails shaping metal using compressive forces from a press.",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://siderforgerossi.com/fast-track-flender-project/",
          "title": "Siderforgerossi Group · Flender case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://web-assets.bcg.com/pdf-src/prod-live/fixing-aerospaces-supply-chain-for-casting-and-forging.pdf",
          "title": "BCG overview of the forging process",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-air-chillers",
      "name": "Air-cooled chillers",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "14–23 weeks for Air-cooled chillers. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Air-cooled chillers",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "14–23 weeks",
        "weeks_low": 14,
        "weeks_high": 23,
        "quote": "Chillers (Air Cooled) 14-23 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Chilled-water plant equipment",
        "technical_excerpt": "Air-cooled chillers use fans to blow air over the condenser, while water-cooled chillers transfer heat to a water loop",
        "lead_band": "12 to under 26 weeks",
        "range_width": 9,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/about-us/newsroom/glossary/chillers.html",
          "title": "Trane chiller technical guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "albertville-domestic-alternate-a",
      "name": "Alternate domestic 36-inch butterfly valve, first quote",
      "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
      "summary": "46 weeks for Alternate domestic 36-inch butterfly valve, first quote. Municipal Utilities Board of Albertville reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2026-05-04",
        "category": "Valves",
        "specification": "Alternate domestic 36-inch butterfly valve, first quote",
        "publisher": "Municipal Utilities Board of Albertville",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "46 weeks",
        "weeks_low": 46,
        "weeks_high": 46,
        "quote": "The lead times quoted by these manufacturers were 46 Weeks, 30-36 Weeks, and 30-36 Weeks, respectively.",
        "source_locator": "Waiver request, first alternate domestic quote",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
          "title": "Municipal Utilities Board of Albertville · Waiver request, first alternate domestic quote",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "albertville-domestic-alternate-b",
      "name": "Alternate domestic 36-inch butterfly valve, second quote",
      "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
      "summary": "30–36 weeks for Alternate domestic 36-inch butterfly valve, second quote. Municipal Utilities Board of Albertville reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2026-05-04",
        "category": "Valves",
        "specification": "Alternate domestic 36-inch butterfly valve, second quote",
        "publisher": "Municipal Utilities Board of Albertville",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "30–36 weeks",
        "weeks_low": 30,
        "weeks_high": 36,
        "quote": "The lead times quoted by these manufacturers were 46 Weeks, 30-36 Weeks, and 30-36 Weeks, respectively.",
        "source_locator": "Waiver request, second alternate domestic quote",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
          "title": "Municipal Utilities Board of Albertville · Waiver request, second alternate domestic quote",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "albertville-domestic-alternate-c",
      "name": "Alternate domestic 36-inch butterfly valve, third quote",
      "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
      "summary": "30–36 weeks for Alternate domestic 36-inch butterfly valve, third quote. Municipal Utilities Board of Albertville reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2026-05-04",
        "category": "Valves",
        "specification": "Alternate domestic 36-inch butterfly valve, third quote",
        "publisher": "Municipal Utilities Board of Albertville",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "30–36 weeks",
        "weeks_low": 30,
        "weeks_high": 36,
        "quote": "The lead times quoted by these manufacturers were 46 Weeks, 30-36 Weeks, and 30-36 Weeks, respectively.",
        "source_locator": "Waiver request, third alternate domestic quote",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
          "title": "Municipal Utilities Board of Albertville · Waiver request, third alternate domestic quote",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flowserve-atomac-akh2-2-inch",
      "name": "Atomac AKH2 PFA 2-inch ductile-iron ball valve",
      "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
      "summary": "4 weeks for Atomac AKH2 PFA 2-inch ductile-iron ball valve. Flowserve reports this as factory estimate evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2024-01-22",
        "category": "Valves",
        "specification": "Atomac AKH2 PFA 2-inch ductile-iron ball valve",
        "publisher": "Flowserve",
        "basis": "Factory estimate",
        "clock": "Manufacturing lead time",
        "duration": "4 weeks",
        "weeks_low": 4,
        "weeks_high": 4,
        "quote": "Atomac AKH2 PFA - Size 2\" - Ductile Iron 4",
        "source_locator": "CVO table, Atomac lined ball valves",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
          "title": "Flowserve · CVO table, Atomac lined ball valves",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flowserve-atomac-akh2-4-inch",
      "name": "Atomac AKH2 PFA 4-inch ductile-iron ball valve",
      "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
      "summary": "12 weeks for Atomac AKH2 PFA 4-inch ductile-iron ball valve. Flowserve reports this as factory estimate evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2024-01-22",
        "category": "Valves",
        "specification": "Atomac AKH2 PFA 4-inch ductile-iron ball valve",
        "publisher": "Flowserve",
        "basis": "Factory estimate",
        "clock": "Manufacturing lead time",
        "duration": "12 weeks",
        "weeks_low": 12,
        "weeks_high": 12,
        "quote": "Atomac AKH2 PFA - Size 4\" - Ductile Iron 12",
        "source_locator": "CVO table, Atomac lined ball valves",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
          "title": "Flowserve · CVO table, Atomac lined ball valves",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flowserve-atomac-akh2a-4-inch",
      "name": "Atomac AKH2A PFA 4-inch ductile-iron ball valve",
      "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
      "summary": "18 weeks for Atomac AKH2A PFA 4-inch ductile-iron ball valve. Flowserve reports this as factory estimate evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2024-01-22",
        "category": "Valves",
        "specification": "Atomac AKH2A PFA 4-inch ductile-iron ball valve",
        "publisher": "Flowserve",
        "basis": "Factory estimate",
        "clock": "Manufacturing lead time",
        "duration": "18 weeks",
        "weeks_low": 18,
        "weeks_high": 18,
        "quote": "Atomac AKH2A PFA - Size 4\" - Ductile Iron 18",
        "source_locator": "CVO table, Atomac lined ball valves",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
          "title": "Flowserve · CVO table, Atomac lined ball valves",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "acorn-bonfiglioli-flange-replacement",
      "name": "Bonfiglioli motor with nonstandard flange",
      "url": "https://www.acorn-ind.co.uk/insight/fast-response-to-motor-failure-saves-production/",
      "summary": "8 weeks for Bonfiglioli motor with nonstandard flange. ACORN Industrial Services reports this as supplier estimate evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2025-07-22",
        "category": "Motors",
        "specification": "Bonfiglioli motor with nonstandard flange",
        "publisher": "ACORN Industrial Services",
        "basis": "Supplier estimate",
        "clock": "OEM replacement",
        "duration": "8 weeks",
        "weeks_low": 8,
        "weeks_high": 8,
        "quote": "The specialist motor had an 8-week OEM lead time",
        "source_locator": "Case study, Quick facts",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.acorn-ind.co.uk/insight/fast-response-to-motor-failure-saves-production/",
          "title": "ACORN Industrial Services · Case study, Quick facts",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2246-border-states",
      "name": "Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "30–32 weeks for Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "30–32 weeks",
        "weeks_low": 30,
        "weeks_high": 32,
        "quote": "Wire in Duct, AL, 15kV, 1/0 Solid, 1/C",
        "source_locator": "RPU item 1 · stock 2246 · requested 27,000 ft · Border States / Prysmian",
        "quoted_cell": "30-32",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · Border States / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2247-border-states",
      "name": "Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "24–26 weeks for Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "24–26 weeks",
        "weeks_low": 24,
        "weeks_high": 26,
        "quote": "Wire, AL, 15kV, 1/0 Solid, 1/C, Jacketed",
        "source_locator": "RPU item 2 · stock 2247 · requested 99,900 ft · Border States / Prysmian",
        "quoted_cell": "24-26",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · Border States / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-11042-border-states",
      "name": "Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "24–26 weeks for Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "24–26 weeks",
        "weeks_low": 24,
        "weeks_high": 26,
        "quote": "Wire, AL, 15 kV, 4/0 Stranded, 1/C, Jacketed 220m",
        "source_locator": "RPU item 3 · stock 11042 · requested 10,000 ft · Border States / Prysmian",
        "quoted_cell": "24-26",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · Border States / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-16294-border-states",
      "name": "Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "24–26 weeks for Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "24–26 weeks",
        "weeks_low": 24,
        "weeks_high": 26,
        "quote": "Wire, AL, 15 kV, 750 Stranded, 1/C Jacketed 220m",
        "source_locator": "RPU item 4 · stock 16294 · requested 66,000 ft · Border States / Prysmian",
        "quoted_cell": "24-26",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · Border States / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "west-point-cold-springs-box-culvert",
      "name": "Cold Springs Road concrete box culvert",
      "url": "https://www.utah.gov/pmn/files/1333141.pdf#page=48",
      "summary": "8 weeks for Cold Springs Road concrete box culvert. City of West Point, Utah reports this as buyer estimate evidence.",
      "tags": [
        "Precast"
      ],
      "fields": {
        "period": "2025-10-07",
        "category": "Precast",
        "specification": "Cold Springs Road concrete box culvert",
        "publisher": "City of West Point, Utah",
        "basis": "Buyer estimate",
        "clock": "Purchase lead time",
        "duration": "8 weeks",
        "weeks_low": 8,
        "weeks_high": 8,
        "quote": "It recently came to our attention that the lead time to purchase the box culvert is about eight weeks",
        "source_locator": "City Council staff report, p. 48",
        "quoted_cell": null,
        "product_family": "Precast concrete drainage structures",
        "technical_excerpt": "Precast concrete box and 3-sided culverts are incredibly versatile",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.utah.gov/pmn/files/1333141.pdf#page=48",
          "title": "City of West Point, Utah · City Council staff report, p. 48",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://precast.org/products/box-3-sided-culverts/",
          "title": "NPCA technical overview of box culverts",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-commercial-ahu",
      "name": "Commercial-grade air handling units",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "16–20 weeks for Commercial-grade air handling units. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Commercial-grade air handling units",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "16–20 weeks",
        "weeks_low": 16,
        "weeks_high": 20,
        "quote": "AHUs (Commercial Grade) 16-20 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Air distribution and rooftop HVAC",
        "technical_excerpt": "A typical VAV system consists of a rooftop unit, water-cooled self-contained unit, or an air handling unit",
        "lead_band": "12 to under 26 weeks",
        "range_width": 4,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/products-systems/systems/intelligent-variable-air-systems.html",
          "title": "Trane VAV system guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "calnext-stocked-motors",
      "name": "Commonly stocked 1–20 hp motors",
      "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
      "summary": "1–2 weeks for Commonly stocked 1–20 hp motors. CalNEXT reports this as pilot benchmark evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2025-01-02",
        "category": "Motors",
        "specification": "Commonly stocked 1–20 hp motors",
        "publisher": "CalNEXT",
        "basis": "Pilot benchmark",
        "clock": "Equipment lead time",
        "duration": "1–2 weeks",
        "weeks_low": 1,
        "weeks_high": 2,
        "quote": "manufacturer are roughly 1 to 2 weeks.",
        "source_locator": "Final report, p. 13",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "Under 4 weeks",
        "range_width": 1,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
          "title": "CalNEXT · Final report, p. 13",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-custom-ahu",
      "name": "Custom air handling units",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "20–33 weeks for Custom air handling units. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Custom air handling units",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "20–33 weeks",
        "weeks_low": 20,
        "weeks_high": 33,
        "quote": "AHUs (Custom) 20-33 weeks Stable",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Air distribution and rooftop HVAC",
        "technical_excerpt": "A typical VAV system consists of a rooftop unit, water-cooled self-contained unit, or an air handling unit",
        "lead_band": "12 to under 26 weeks",
        "range_width": 13,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/products-systems/systems/intelligent-variable-air-systems.html",
          "title": "Trane VAV system guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "calnext-custom-motor",
      "name": "Custom-order advanced motor",
      "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
      "summary": "6 weeks for Custom-order advanced motor. CalNEXT reports this as reported wait evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2025-01-02",
        "category": "Motors",
        "specification": "Custom-order advanced motor",
        "publisher": "CalNEXT",
        "basis": "Reported wait",
        "clock": "Equipment lead time",
        "duration": "6 weeks",
        "weeks_low": 6,
        "weeks_high": 6,
        "quote": "a six-week lead time because they needed a custom-order",
        "source_locator": "Final report, p. 13",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
          "title": "CalNEXT · Final report, p. 13",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "albertville-domestic-butterfly",
      "name": "Domestic 36-inch ductile-iron butterfly valve",
      "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
      "summary": "30–38 weeks for Domestic 36-inch ductile-iron butterfly valve. Municipal Utilities Board of Albertville reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2026-05-04",
        "category": "Valves",
        "specification": "Domestic 36-inch ductile-iron butterfly valve",
        "publisher": "Municipal Utilities Board of Albertville",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "30–38 weeks",
        "weeks_low": 30,
        "weeks_high": 38,
        "quote": "36-Inch Butterfly Valve Misc. Waiver Information",
        "source_locator": "Waiver request, domestic column, lead-time table",
        "quoted_cell": "30-38",
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 8,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
          "title": "Municipal Utilities Board of Albertville · Waiver request, domestic column, lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "flowserve-durco-btv-tfe",
      "name": "Durco BTV 2–12-inch TFE-lined butterfly valves",
      "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
      "summary": "18 weeks for Durco BTV 2–12-inch TFE-lined butterfly valves. Flowserve reports this as factory estimate evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2024-01-22",
        "category": "Valves",
        "specification": "Durco BTV 2–12-inch TFE-lined butterfly valves",
        "publisher": "Flowserve",
        "basis": "Factory estimate",
        "clock": "Manufacturing lead time",
        "duration": "18 weeks",
        "weeks_low": 18,
        "weeks_high": 18,
        "quote": "Wafer & Lug, Std. TFE Liner, PFA Disc (480 / 481 Model) 18",
        "source_locator": "CVO table, Durco plug and butterfly valves",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf",
          "title": "Flowserve · CVO table, Durco plug and butterfly valves",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "state-line-casting-backlogs-2021-22",
      "name": "Foundry backlogs in 2021–2022",
      "url": "https://www.slfcastings.com/switching-foundries-backlogs/",
      "summary": "20+ weeks for Foundry backlogs in 2021–2022. State Line Foundries reports this as backlog evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "2021–2022",
        "category": "Castings",
        "specification": "Foundry backlogs in 2021–2022",
        "publisher": "State Line Foundries",
        "basis": "Backlog",
        "clock": "Backlog of work",
        "duration": "20+ weeks",
        "weeks_low": 20,
        "weeks_high": null,
        "quote": "In 2021 and 2022, casting backlogs were out 20-plus weeks for most foundries",
        "source_locator": "September 27, 2023 interview",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "12 to under 26 weeks",
        "range_width": null,
        "duration_type": "Lower bound only"
      },
      "sources": [
        {
          "url": "https://www.slfcastings.com/switching-foundries-backlogs/",
          "title": "State Line Foundries · September 27, 2023 interview",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "calnext-ie4",
      "name": "IE4 motors from surveyed manufacturer",
      "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
      "summary": "2–4 weeks for IE4 motors from surveyed manufacturer. CalNEXT reports this as supplier benchmark evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2025-01-02",
        "category": "Motors",
        "specification": "IE4 motors from surveyed manufacturer",
        "publisher": "CalNEXT",
        "basis": "Supplier benchmark",
        "clock": "Equipment lead time",
        "duration": "2–4 weeks",
        "weeks_low": 2,
        "weeks_high": 4,
        "quote": "is two to four weeks, depending on",
        "source_locator": "Final report, p. 13",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "Under 4 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19",
          "title": "CalNEXT · Final report, p. 13",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "albertville-imported-butterfly",
      "name": "Imported 36-inch ductile-iron butterfly valve",
      "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
      "summary": "6–8 weeks for Imported 36-inch ductile-iron butterfly valve. Municipal Utilities Board of Albertville reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2026-05-04",
        "category": "Valves",
        "specification": "Imported 36-inch ductile-iron butterfly valve",
        "publisher": "Municipal Utilities Board of Albertville",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "6–8 weeks",
        "weeks_low": 6,
        "weeks_high": 8,
        "quote": "36-Inch Butterfly Valve Misc. Waiver Information",
        "source_locator": "Waiver request, foreign column, lead-time table",
        "quoted_cell": "6-8",
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "4 to under 12 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2",
          "title": "Municipal Utilities Board of Albertville · Waiver request, foreign column, lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2246-irby",
      "name": "IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "32–34 weeks for IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "32–34 weeks",
        "weeks_low": 32,
        "weeks_high": 34,
        "quote": "Wire in Duct, AL, 15kV, 1/0 Solid, 1/C",
        "source_locator": "RPU item 1 · stock 2246 · requested 27,000 ft · IRBY / Okonite",
        "quoted_cell": "32-34",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · IRBY / Okonite",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2247-irby",
      "name": "IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "30–32 weeks for IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "30–32 weeks",
        "weeks_low": 30,
        "weeks_high": 32,
        "quote": "Wire, AL, 15kV, 1/0 Solid, 1/C, Jacketed",
        "source_locator": "RPU item 2 · stock 2247 · requested 99,900 ft · IRBY / Okonite",
        "quoted_cell": "30-32",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · IRBY / Okonite",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-11042-irby",
      "name": "IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "34–36 weeks for IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "34–36 weeks",
        "weeks_low": 34,
        "weeks_high": 36,
        "quote": "Wire, AL, 15 kV, 4/0 Stranded, 1/C, Jacketed 220m",
        "source_locator": "RPU item 3 · stock 11042 · requested 10,000 ft · IRBY / Okonite",
        "quoted_cell": "34-36",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · IRBY / Okonite",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-16294-irby",
      "name": "IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "26–28 weeks for IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "26–28 weeks",
        "weeks_low": 26,
        "weeks_high": 28,
        "quote": "Wire, AL, 15 kV, 750 Stranded, 1/C Jacketed 220m",
        "source_locator": "RPU item 4 · stock 16294 · requested 66,000 ft · IRBY / Okonite",
        "quoted_cell": "26-28",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · IRBY / Okonite",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "doe-large-nuclear-forgings",
      "name": "Large nuclear forgings",
      "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf#page=36",
      "summary": "24–48 months for Large nuclear forgings. US Department of Energy reports this as workshop estimate evidence.",
      "tags": [
        "Forgings"
      ],
      "fields": {
        "period": "2024-02",
        "category": "Forgings",
        "specification": "Large nuclear forgings",
        "publisher": "US Department of Energy",
        "basis": "Workshop estimate",
        "clock": "Acquisition",
        "duration": "24–48 months",
        "weeks_low": 104.4,
        "weeks_high": 208.7,
        "quote": "24–48 months for large forgings used for nuclear applications",
        "source_locator": "Workshop breakout group, PDF page 36",
        "quoted_cell": null,
        "product_family": "Forged metal components",
        "technical_excerpt": "Forging entails shaping metal using compressive forces from a press.",
        "lead_band": "52 weeks and up",
        "range_width": 104.3,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf#page=36",
          "title": "US Department of Energy · Workshop breakout group, PDF page 36",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://web-assets.bcg.com/pdf-src/prod-live/fixing-aerospaces-supply-chain-for-casting-and-forging.pdf",
          "title": "BCG overview of the forging process",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-lv-switchgear-q1-2026",
      "name": "Low-voltage switchgear",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "32–54 weeks for Low-voltage switchgear. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "Switchgear"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "Switchgear",
        "specification": "Low-voltage switchgear",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "32–54 weeks",
        "weeks_low": 32,
        "weeks_high": 54,
        "quote": "32-54 weeks (slight improvement in deliveries)",
        "source_locator": "Q1 2026 lead-time table, Switchgear LV",
        "quoted_cell": null,
        "product_family": "Electrical distribution switching and protection",
        "technical_excerpt": "provides centralized control and protection of medium-voltage power equipment",
        "lead_band": "26 to under 52 weeks",
        "range_width": 22,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table, Switchgear LV",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.eaton.com/us/en-us/products/medium-voltage-power-distribution-control-systems/switchgear.html",
          "title": "Eaton distribution switchgear overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "severn-replacement-valve-delivery",
      "name": "Main water injection valve, expedited delivery",
      "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
      "summary": "20 weeks for Main water injection valve, expedited delivery. Severn reports this as reported delivery evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2022-11-22",
        "category": "Valves",
        "specification": "Main water injection valve, expedited delivery",
        "publisher": "Severn",
        "basis": "Reported delivery",
        "clock": "Replacement delivery",
        "duration": "20 weeks",
        "weeks_low": 20,
        "weeks_high": 20,
        "quote": "the new valve in 20 weeks.",
        "source_locator": "Replacement case study",
        "quoted_cell": null,
        "product_family": "Process flow valves and service parts",
        "technical_excerpt": "An isolation valve stops the flow of gas, liquid, slurry or powder.",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
          "title": "Severn · Replacement case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson process valve overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "severn-replacement-valve-standard",
      "name": "Main water injection valve, standard replacement",
      "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
      "summary": "30 weeks for Main water injection valve, standard replacement. Severn reports this as supplier benchmark evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2022-11-22",
        "category": "Valves",
        "specification": "Main water injection valve, standard replacement",
        "publisher": "Severn",
        "basis": "Supplier benchmark",
        "clock": "Replacement delivery",
        "duration": "30 weeks",
        "weeks_low": 30,
        "weeks_high": 30,
        "quote": "a complete valve replacement is around 30 weeks",
        "source_locator": "Replacement case study",
        "quoted_cell": null,
        "product_family": "Process flow valves and service parts",
        "technical_excerpt": "An isolation valve stops the flow of gas, liquid, slurry or powder.",
        "lead_band": "26 to under 52 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
          "title": "Severn · Replacement case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson process valve overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "lebanon-mccann-box-culvert",
      "name": "McCann Concrete Products 8 × 6 ft box culvert sections",
      "url": "https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3",
      "summary": "94 days for McCann Concrete Products 8 × 6 ft box culvert sections. City of Lebanon, Missouri reports this as public bid evidence.",
      "tags": [
        "Precast"
      ],
      "fields": {
        "period": "2022-05-17",
        "category": "Precast",
        "specification": "McCann Concrete Products 8 × 6 ft box culvert sections",
        "publisher": "City of Lebanon, Missouri",
        "basis": "Public bid",
        "clock": "From executed contract",
        "duration": "94 days",
        "weeks_low": 13.4,
        "weeks_high": 13.4,
        "quote": "94 days after receipt of executed",
        "source_locator": "ITB ST-08-220517-F-652, Exhibit A",
        "quoted_cell": null,
        "product_family": "Precast concrete drainage structures",
        "technical_excerpt": "Precast concrete box and 3-sided culverts are incredibly versatile",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3",
          "title": "City of Lebanon, Missouri · ITB ST-08-220517-F-652, Exhibit A",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://precast.org/products/box-3-sided-culverts/",
          "title": "NPCA technical overview of box culverts",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "skanska-switchgear-fall-2026",
      "name": "Medium- and low-voltage switchgear",
      "url": "https://interactive.usa.skanska.com/fall-2026-construction-market-trends/supply-chain",
      "summary": "52+ weeks for Medium- and low-voltage switchgear. Skanska USA Building reports this as market report evidence.",
      "tags": [
        "Switchgear"
      ],
      "fields": {
        "period": "2026-Fall",
        "category": "Switchgear",
        "specification": "Medium- and low-voltage switchgear",
        "publisher": "Skanska USA Building",
        "basis": "Market report",
        "clock": "Excludes submittals",
        "duration": "52+ weeks",
        "weeks_low": 52,
        "weeks_high": null,
        "quote": "lead times for electrical gear increased over the past quarter, specifically for medium- and low-voltage switchgear, which now exceed 52 weeks.",
        "source_locator": "Fall 2026, Electrical",
        "quoted_cell": null,
        "product_family": "Electrical distribution switching and protection",
        "technical_excerpt": "provides centralized control and protection of medium-voltage power equipment",
        "lead_band": "52 weeks and up",
        "range_width": null,
        "duration_type": "Lower bound only"
      },
      "sources": [
        {
          "url": "https://interactive.usa.skanska.com/fall-2026-construction-market-trends/supply-chain",
          "title": "Skanska USA Building · Fall 2026, Electrical",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.eaton.com/us/en-us/products/medium-voltage-power-distribution-control-systems/switchgear.html",
          "title": "Eaton distribution switchgear overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "skanska-mv-cable-spring-2023",
      "name": "Medium-voltage cable",
      "url": "https://view.ceros.com/skanska/skanska-construction-trends-spring-23/p/7",
      "summary": "30–45 weeks for Medium-voltage cable. Skanska USA Building reports this as market report evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2023-Spring",
        "category": "MV cable",
        "specification": "Medium-voltage cable",
        "publisher": "Skanska USA Building",
        "basis": "Market report",
        "clock": "Market lead time",
        "duration": "30–45 weeks",
        "weeks_low": 30,
        "weeks_high": 45,
        "quote": "However, medium voltage cable lead times are still in the 30-45 week range.",
        "source_locator": "Spring 2023, Electrical",
        "quoted_cell": null,
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 15,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://view.ceros.com/skanska/skanska-construction-trends-spring-23/p/7",
          "title": "Skanska USA Building · Spring 2023, Electrical",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "skanska-mv-switchgear-summer-2022",
      "name": "Medium-voltage switchgear",
      "url": "https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7",
      "summary": "18–24 weeks for Medium-voltage switchgear. Skanska USA Building reports this as market report evidence.",
      "tags": [
        "Switchgear"
      ],
      "fields": {
        "period": "2022-Summer",
        "category": "Switchgear",
        "specification": "Medium-voltage switchgear",
        "publisher": "Skanska USA Building",
        "basis": "Market report",
        "clock": "Market lead time",
        "duration": "18–24 weeks",
        "weeks_low": 18,
        "weeks_high": 24,
        "quote": "medium voltage switchgear lead times are between 18 and 24 weeks.",
        "source_locator": "Summer 2022, Electrical",
        "quoted_cell": null,
        "product_family": "Electrical distribution switching and protection",
        "technical_excerpt": "provides centralized control and protection of medium-voltage power equipment",
        "lead_band": "12 to under 26 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7",
          "title": "Skanska USA Building · Summer 2022, Electrical",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.eaton.com/us/en-us/products/medium-voltage-power-distribution-control-systems/switchgear.html",
          "title": "Eaton distribution switchgear overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-mv-switchgear-q1-2026",
      "name": "Medium-voltage switchgear",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "49–82 weeks for Medium-voltage switchgear. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "Switchgear"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "Switchgear",
        "specification": "Medium-voltage switchgear",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "49–82 weeks",
        "weeks_low": 49,
        "weeks_high": 82,
        "quote": "49-82 weeks (slight improvement in deliveries)",
        "source_locator": "Q1 2026 lead-time table, Switchgear MV",
        "quoted_cell": null,
        "product_family": "Electrical distribution switching and protection",
        "technical_excerpt": "provides centralized control and protection of medium-voltage power equipment",
        "lead_band": "26 to under 52 weeks",
        "range_width": 33,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table, Switchgear MV",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.eaton.com/us/en-us/products/medium-voltage-power-distribution-control-systems/switchgear.html",
          "title": "Eaton distribution switchgear overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "georgetown-municipal-16-inch-ball",
      "name": "Municipal Valve 16-inch metal-seated ball valve",
      "url": "https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf",
      "summary": "40–44 weeks for Municipal Valve 16-inch metal-seated ball valve. City of Georgetown, Texas reports this as public bid evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2023-10-12",
        "category": "Valves",
        "specification": "Municipal Valve 16-inch metal-seated ball valve",
        "publisher": "City of Georgetown, Texas",
        "basis": "Public bid",
        "clock": "Standard quote",
        "duration": "40–44 weeks",
        "weeks_low": 40,
        "weeks_high": 44,
        "quote": "Municipal Valve stated the lead time for this valve is 40-44 weeks long.",
        "source_locator": "Parkside–Round Rock interconnect",
        "quoted_cell": null,
        "product_family": "Ball and butterfly isolation valves",
        "technical_excerpt": "including ball valves, butterfly valves, gate valves, globe valves",
        "lead_band": "26 to under 52 weeks",
        "range_width": 4,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf",
          "title": "City of Georgetown, Texas · Parkside–Round Rock interconnect",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson isolation valve catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "commerce-new-forging-orders-1992",
      "name": "New forging orders in the US industry survey",
      "url": "https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9",
      "summary": "39.3 weeks for New forging orders in the US industry survey. US Department of Commerce reports this as historical survey average evidence.",
      "tags": [
        "Forgings"
      ],
      "fields": {
        "period": "1992-12",
        "category": "Forgings",
        "specification": "New forging orders in the US industry survey",
        "publisher": "US Department of Commerce",
        "basis": "Historical survey average",
        "clock": "Reported procurement lead time",
        "duration": "39.3 weeks",
        "weeks_low": 39.3,
        "weeks_high": 39.3,
        "quote": "Forging lead times for new orders averaged 39.3 weeks, and for repeat business, 15.4 weeks.",
        "source_locator": "Executive summary, printed page v",
        "quoted_cell": null,
        "product_family": "Forged metal components",
        "technical_excerpt": "Forging entails shaping metal using compressive forces from a press.",
        "lead_band": "26 to under 52 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9",
          "title": "US Department of Commerce · Executive summary, printed page v",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://web-assets.bcg.com/pdf-src/prod-live/fixing-aerospaces-supply-chain-for-casting-and-forging.pdf",
          "title": "BCG overview of the forging process",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "acorn-imperial-shaft-gearmotor",
      "name": "Nonstandard imperial-shaft gearmotor",
      "url": "https://www.acorn-ind.co.uk/insight/how-a-24-hour-gearmotor-repair-prevented-677-million-in-downtime/",
      "summary": "4+ weeks for Nonstandard imperial-shaft gearmotor. ACORN Industrial Services reports this as supplier estimate evidence.",
      "tags": [
        "Motors"
      ],
      "fields": {
        "period": "2026-07-13",
        "category": "Motors",
        "specification": "Nonstandard imperial-shaft gearmotor",
        "publisher": "ACORN Industrial Services",
        "basis": "Supplier estimate",
        "clock": "Replacement arrival",
        "duration": "4+ weeks",
        "weeks_low": 4,
        "weeks_high": null,
        "quote": "a replacement from the original manufacturer would take a minimum of four weeks to arrive.",
        "source_locator": "Case study, The Challenge",
        "quoted_cell": null,
        "product_family": "Industrial electric motor systems",
        "technical_excerpt": "United States Industrial Electric Motor Systems Market Opportunities Assessment",
        "lead_band": "4 to under 12 weeks",
        "range_width": null,
        "duration_type": "Lower bound only"
      },
      "sources": [
        {
          "url": "https://www.acorn-ind.co.uk/insight/how-a-24-hour-gearmotor-repair-prevented-677-million-in-downtime/",
          "title": "ACORN Industrial Services · Case study, The Challenge",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/cmei/ito/motor-systems",
          "title": "DOE industrial motor systems resources",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "skanska-5-to-15kv-summer-2022",
      "name": "Nonstock 5–15 kV cable",
      "url": "https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7",
      "summary": "14–20 weeks for Nonstock 5–15 kV cable. Skanska USA Building reports this as market report evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2022-Summer",
        "category": "MV cable",
        "specification": "Nonstock 5–15 kV cable",
        "publisher": "Skanska USA Building",
        "basis": "Market report",
        "clock": "Market lead time",
        "duration": "14–20 weeks",
        "weeks_low": 14,
        "weeks_high": 20,
        "quote": "now running 14 to 20 weeks if they’re not in stock",
        "source_locator": "Summer 2022, Electrical",
        "quoted_cell": null,
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7",
          "title": "Skanska USA Building · Summer 2022, Electrical",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "portland-okonite-500-mcm",
      "name": "Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV",
      "url": "https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44",
      "summary": "8–10 weeks for Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV. City of Portland, Michigan reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2025-08-04",
        "category": "MV cable",
        "specification": "Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV",
        "publisher": "City of Portland, Michigan",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "8–10 weeks",
        "weeks_low": 8,
        "weeks_high": 10,
        "quote": "Competitive bids were solicited for both products, with the following results:",
        "source_locator": "Substation memo, Okonite row",
        "quoted_cell": "8-10 weeks",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "4 to under 12 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44",
          "title": "City of Portland, Michigan · Substation memo, Okonite row",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "geneva-carbon-ave-box-culvert",
      "name": "Price, Utah, 16 × 4 ft box culvert",
      "url": "https://www.utah.gov/pmn/files/1341541.pdf#page=2",
      "summary": "6–7 weeks for Price, Utah, 16 × 4 ft box culvert. Geneva Pipe Company reports this as public bid evidence.",
      "tags": [
        "Precast"
      ],
      "fields": {
        "period": "2025-10-23",
        "category": "Precast",
        "specification": "Price, Utah, 16 × 4 ft box culvert",
        "publisher": "Geneva Pipe Company",
        "basis": "Public bid",
        "clock": "From submittal approval",
        "duration": "6–7 weeks",
        "weeks_low": 6,
        "weeks_high": 7,
        "quote": "LEAD TIME IS APPROX 6-7 WEEKS AFTER SUBMITTAL APPROVAL",
        "source_locator": "Quote 56708, Carbon Ave canal crossing",
        "quoted_cell": null,
        "product_family": "Precast concrete drainage structures",
        "technical_excerpt": "Precast concrete box and 3-sided culverts are incredibly versatile",
        "lead_band": "4 to under 12 weeks",
        "range_width": 1,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.utah.gov/pmn/files/1341541.pdf#page=2",
          "title": "Geneva Pipe Company · Quote 56708, Carbon Ave canal crossing",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://precast.org/products/box-3-sided-culverts/",
          "title": "NPCA technical overview of box culverts",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "commerce-repeat-forging-orders-1992",
      "name": "Repeat forging orders in the US industry survey",
      "url": "https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9",
      "summary": "15.4 weeks for Repeat forging orders in the US industry survey. US Department of Commerce reports this as historical survey average evidence.",
      "tags": [
        "Forgings"
      ],
      "fields": {
        "period": "1992-12",
        "category": "Forgings",
        "specification": "Repeat forging orders in the US industry survey",
        "publisher": "US Department of Commerce",
        "basis": "Historical survey average",
        "clock": "Reported procurement lead time",
        "duration": "15.4 weeks",
        "weeks_low": 15.4,
        "weeks_high": 15.4,
        "quote": "Forging lead times for new orders averaged 39.3 weeks, and for repeat business, 15.4 weeks.",
        "source_locator": "Executive summary, printed page v",
        "quoted_cell": null,
        "product_family": "Forged metal components",
        "technical_excerpt": "Forging entails shaping metal using compressive forces from a press.",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9",
          "title": "US Department of Commerce · Executive summary, printed page v",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://web-assets.bcg.com/pdf-src/prod-live/fixing-aerospaces-supply-chain-for-casting-and-forging.pdf",
          "title": "BCG overview of the forging process",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "portland-kerite-500-mcm",
      "name": "RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV",
      "url": "https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44",
      "summary": "10 weeks for RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV. City of Portland, Michigan reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2025-08-04",
        "category": "MV cable",
        "specification": "RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV",
        "publisher": "City of Portland, Michigan",
        "basis": "Public bid",
        "clock": "Quoted lead time",
        "duration": "10 weeks",
        "weeks_low": 10,
        "weeks_high": 10,
        "quote": "Competitive bids were solicited for both products, with the following results:",
        "source_locator": "Substation memo, Kerite row",
        "quoted_cell": "10 weeks",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44",
          "title": "City of Portland, Michigan · Substation memo, Kerite row",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2246-resco",
      "name": "RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "31–33 weeks for RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "31–33 weeks",
        "weeks_low": 31,
        "weeks_high": 33,
        "quote": "Wire in Duct, AL, 15kV, 1/0 Solid, 1/C",
        "source_locator": "RPU item 1 · stock 2246 · requested 27,000 ft · RESCO / Prysmian",
        "quoted_cell": "31-33",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · RESCO / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2247-resco",
      "name": "RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "25–27 weeks for RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "25–27 weeks",
        "weeks_low": 25,
        "weeks_high": 27,
        "quote": "Wire, AL, 15kV, 1/0 Solid, 1/C, Jacketed",
        "source_locator": "RPU item 2 · stock 2247 · requested 99,900 ft · RESCO / Prysmian",
        "quoted_cell": "25-27",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · RESCO / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-11042-resco",
      "name": "RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "25–27 weeks for RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "25–27 weeks",
        "weeks_low": 25,
        "weeks_high": 27,
        "quote": "Wire, AL, 15 kV, 4/0 Stranded, 1/C, Jacketed 220m",
        "source_locator": "RPU item 3 · stock 11042 · requested 10,000 ft · RESCO / Prysmian",
        "quoted_cell": "25-27",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · RESCO / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-16294-resco",
      "name": "RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "25–27 weeks for RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "25–27 weeks",
        "weeks_low": 25,
        "weeks_high": 27,
        "quote": "Wire, AL, 15 kV, 750 Stranded, 1/C Jacketed 220m",
        "source_locator": "RPU item 4 · stock 16294 · requested 66,000 ft · RESCO / Prysmian",
        "quoted_cell": "25-27",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · RESCO / Prysmian",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "cti-high-strength-steel-castings",
      "name": "Reverse-engineered high-strength steel castings",
      "url": "https://www.foundrymag.com/molds-cores/article/21928864/metalcaster-adopts-3dp-keeps-its-focus-on-casting",
      "summary": "3 weeks for Reverse-engineered high-strength steel castings. Foundry Management & Technology reports this as reported production evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "2016-08-12",
        "category": "Castings",
        "specification": "Reverse-engineered high-strength steel castings",
        "publisher": "Foundry Management & Technology",
        "basis": "Reported production",
        "clock": "Reverse engineering through manufacture",
        "duration": "3 weeks",
        "weeks_low": 3,
        "weeks_high": 3,
        "quote": "In just three weeks, Casting Technologies International managed to reverse engineer a component",
        "source_locator": "Casting Technologies International case",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "Under 4 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.foundrymag.com/molds-cores/article/21928864/metalcaster-adopts-3dp-keeps-its-focus-on-casting",
          "title": "Foundry Management & Technology · Casting Technologies International case",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-rooftop-over-50",
      "name": "Rooftop HVAC units above 50 tons",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "13–22 weeks for Rooftop HVAC units above 50 tons. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Rooftop HVAC units above 50 tons",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "13–22 weeks",
        "weeks_low": 13,
        "weeks_high": 22,
        "quote": "RTUs (>50 ton) 13-22 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Air distribution and rooftop HVAC",
        "technical_excerpt": "A typical VAV system consists of a rooftop unit, water-cooled self-contained unit, or an air handling unit",
        "lead_band": "12 to under 26 weeks",
        "range_width": 9,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/products-systems/systems/intelligent-variable-air-systems.html",
          "title": "Trane VAV system guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-rooftop-under-50",
      "name": "Rooftop HVAC units below 50 tons",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "12–18 weeks for Rooftop HVAC units below 50 tons. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Rooftop HVAC units below 50 tons",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "12–18 weeks",
        "weeks_low": 12,
        "weeks_high": 18,
        "quote": "RTUs (<50 ton) 12-18 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Air distribution and rooftop HVAC",
        "technical_excerpt": "A typical VAV system consists of a rooftop unit, water-cooled self-contained unit, or an air handling unit",
        "lead_band": "12 to under 26 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/products-systems/systems/intelligent-variable-air-systems.html",
          "title": "Trane VAV system guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "lebanon-scurlock-box-culvert",
      "name": "Scurlock Industries box culvert bid, 291 linear ft",
      "url": "https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3",
      "summary": "14–20 weeks for Scurlock Industries box culvert bid, 291 linear ft. City of Lebanon, Missouri reports this as public bid evidence.",
      "tags": [
        "Precast"
      ],
      "fields": {
        "period": "2022-05-17",
        "category": "Precast",
        "specification": "Scurlock Industries box culvert bid, 291 linear ft",
        "publisher": "City of Lebanon, Missouri",
        "basis": "Public bid",
        "clock": "From award",
        "duration": "14–20 weeks",
        "weeks_low": 14,
        "weeks_high": 20,
        "quote": "Approx. 14-20 weeks after award",
        "source_locator": "ITB ST-08-220517-F-652, Exhibit A",
        "quoted_cell": null,
        "product_family": "Precast concrete drainage structures",
        "technical_excerpt": "Precast concrete box and 3-sided culverts are incredibly versatile",
        "lead_band": "12 to under 26 weeks",
        "range_width": 6,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3",
          "title": "City of Lebanon, Missouri · ITB ST-08-220517-F-652, Exhibit A",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://precast.org/products/box-3-sided-culverts/",
          "title": "NPCA technical overview of box culverts",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "steel-best-practice-roadmap",
      "name": "Steel casting best-practice example",
      "url": "https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31",
      "summary": "4 weeks for Steel casting best-practice example. Cast Metal Coalition reports this as industry benchmark evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "1998-01",
        "category": "Castings",
        "specification": "Steel casting best-practice example",
        "publisher": "Cast Metal Coalition",
        "basis": "Industry benchmark",
        "clock": "Procurement",
        "duration": "4 weeks",
        "weeks_low": 4,
        "weeks_high": 4,
        "quote": "\"best practice\" can bring this time down to about 4 weeks in some cases.",
        "source_locator": "Lead time",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "4 to under 12 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31",
          "title": "Cast Metal Coalition · Lead time",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "sfsa-steel-plant-downturn-backlog",
      "name": "Steel casting plant backlog after sharp demand declines",
      "url": "https://www.sfsa.org/sfsa-casteel-reporter-march-2026/",
      "summary": "6–8 weeks for Steel casting plant backlog after sharp demand declines. Steel Founders’ Society of America reports this as backlog evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "2026-03-23",
        "category": "Castings",
        "specification": "Steel casting plant backlog after sharp demand declines",
        "publisher": "Steel Founders’ Society of America",
        "basis": "Backlog",
        "clock": "Backlog of work",
        "duration": "6–8 weeks",
        "weeks_low": 6,
        "weeks_high": 8,
        "quote": "Sharp declines in demand reduce the reported backlog to 6 to 8 weeks.",
        "source_locator": "Figure 2 commentary",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "4 to under 12 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.sfsa.org/sfsa-casteel-reporter-march-2026/",
          "title": "Steel Founders’ Society of America · Figure 2 commentary",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "sfsa-steel-plant-normal-backlog",
      "name": "Steel casting plant backlog in normal conditions",
      "url": "https://www.sfsa.org/sfsa-casteel-reporter-march-2026/",
      "summary": "8–10 weeks for Steel casting plant backlog in normal conditions. Steel Founders’ Society of America reports this as backlog evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "2026-03-23",
        "category": "Castings",
        "specification": "Steel casting plant backlog in normal conditions",
        "publisher": "Steel Founders’ Society of America",
        "basis": "Backlog",
        "clock": "Backlog of work",
        "duration": "8–10 weeks",
        "weeks_low": 8,
        "weeks_high": 10,
        "quote": "Backlog in normal business conditions is 8 to 10 weeks.",
        "source_locator": "Figure 2 commentary",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "4 to under 12 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.sfsa.org/sfsa-casteel-reporter-march-2026/",
          "title": "Steel Founders’ Society of America · Figure 2 commentary",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "steel-procurement-roadmap",
      "name": "Steel casting procurement",
      "url": "https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31",
      "summary": "20–40 weeks for Steel casting procurement. Cast Metal Coalition reports this as industry benchmark evidence.",
      "tags": [
        "Castings"
      ],
      "fields": {
        "period": "1998-01",
        "category": "Castings",
        "specification": "Steel casting procurement",
        "publisher": "Cast Metal Coalition",
        "basis": "Industry benchmark",
        "clock": "Procurement",
        "duration": "20–40 weeks",
        "weeks_low": 20,
        "weeks_high": 40,
        "quote": "steel castings typically take 20 to 40 weeks to procure",
        "source_locator": "Lead time",
        "quoted_cell": null,
        "product_family": "Near-net-shape metal forming",
        "technical_excerpt": "Technical and Business Challenges for Infrastructure-Scale Near Net Shape Components",
        "lead_band": "12 to under 26 weeks",
        "range_width": 20,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31",
          "title": "Cast Metal Coalition · Lead time",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf",
          "title": "DOE workshop on industrial-scale forming",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "skanska-5kv-spring-2022",
      "name": "Volume purchase of 5 kV cable",
      "url": "https://interactive.usa.skanska.com/skanska-construction-trends-spring-2022/p/5",
      "summary": "20–28 weeks for Volume purchase of 5 kV cable. Skanska USA Building reports this as market report evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2022-Spring",
        "category": "MV cable",
        "specification": "Volume purchase of 5 kV cable",
        "publisher": "Skanska USA Building",
        "basis": "Market report",
        "clock": "Market lead time",
        "duration": "20–28 weeks",
        "weeks_low": 20,
        "weeks_high": 28,
        "quote": "Lead times for highly specific items, such as 5kV medium voltage cable in volume, are running 20–28 weeks",
        "source_locator": "Spring 2022, Electrical",
        "quoted_cell": null,
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 8,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://interactive.usa.skanska.com/skanska-construction-trends-spring-2022/p/5",
          "title": "Skanska USA Building · Spring 2022, Electrical",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "severn-trim-delivery",
      "name": "Water injection valve trim, expedited delivery",
      "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
      "summary": "12 weeks for Water injection valve trim, expedited delivery. Severn reports this as reported delivery evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2022-11-22",
        "category": "Valves",
        "specification": "Water injection valve trim, expedited delivery",
        "publisher": "Severn",
        "basis": "Reported delivery",
        "clock": "Trim delivery",
        "duration": "12 weeks",
        "weeks_low": 12,
        "weeks_high": 12,
        "quote": "set of trims in 12 weeks",
        "source_locator": "Replacement case study",
        "quoted_cell": null,
        "product_family": "Process flow valves and service parts",
        "technical_excerpt": "An isolation valve stops the flow of gas, liquid, slurry or powder.",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
          "title": "Severn · Replacement case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson process valve overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "severn-trim-standard",
      "name": "Water injection valve trim, standard lead",
      "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
      "summary": "22 weeks for Water injection valve trim, standard lead. Severn reports this as supplier benchmark evidence.",
      "tags": [
        "Valves"
      ],
      "fields": {
        "period": "2022-11-22",
        "category": "Valves",
        "specification": "Water injection valve trim, standard lead",
        "publisher": "Severn",
        "basis": "Supplier benchmark",
        "clock": "Trim availability",
        "duration": "22 weeks",
        "weeks_low": 22,
        "weeks_high": 22,
        "quote": "trim parts is 22 weeks",
        "source_locator": "Replacement case study",
        "quoted_cell": null,
        "product_family": "Process flow valves and service parts",
        "technical_excerpt": "An isolation valve stops the flow of gas, liquid, slurry or powder.",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://www.severnvalve.com/severn-exceeds-expectations/",
          "title": "Severn · Replacement case study",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.emerson.com/en/final-control/catalog/products-and-software/valves/isolation-valves",
          "title": "Emerson process valve overview",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-water-chillers-over-1000",
      "name": "Water-cooled chillers above 1,000 tons",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "28–44 weeks for Water-cooled chillers above 1,000 tons. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Water-cooled chillers above 1,000 tons",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "28–44 weeks",
        "weeks_low": 28,
        "weeks_high": 44,
        "quote": "Chillers (Water Cooled, >1000 tons) 28-44 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Chilled-water plant equipment",
        "technical_excerpt": "Air-cooled chillers use fans to blow air over the condenser, while water-cooled chillers transfer heat to a water loop",
        "lead_band": "26 to under 52 weeks",
        "range_width": 16,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/about-us/newsroom/glossary/chillers.html",
          "title": "Trane chiller technical guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "gilbane-water-chillers-under-1000",
      "name": "Water-cooled chillers below 1,000 tons",
      "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
      "summary": "18–30 weeks for Water-cooled chillers below 1,000 tons. Gilbane Building Company reports this as market report evidence.",
      "tags": [
        "HVAC equipment"
      ],
      "fields": {
        "period": "2026-Q1",
        "category": "HVAC equipment",
        "specification": "Water-cooled chillers below 1,000 tons",
        "publisher": "Gilbane Building Company",
        "basis": "Market report",
        "clock": "From order or fabrication release",
        "duration": "18–30 weeks",
        "weeks_low": 18,
        "weeks_high": 30,
        "quote": "Chillers (Water Cooled, <1000 tons) 18-30 weeks",
        "source_locator": "Q1 2026 lead-time table",
        "quoted_cell": null,
        "product_family": "Chilled-water plant equipment",
        "technical_excerpt": "Air-cooled chillers use fans to blow air over the condenser, while water-cooled chillers transfer heat to a water loop",
        "lead_band": "12 to under 26 weeks",
        "range_width": 12,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21",
          "title": "Gilbane Building Company · Q1 2026 lead-time table",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.trane.com/commercial/north-america/us/en/about-us/newsroom/glossary/chillers.html",
          "title": "Trane chiller technical guide",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2246-wesco-cme",
      "name": "WESCO / CME — 15 kV 1/0 solid aluminum cable in duct",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "32–34 weeks for WESCO / CME — 15 kV 1/0 solid aluminum cable in duct. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / CME — 15 kV 1/0 solid aluminum cable in duct",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "32–34 weeks",
        "weeks_low": 32,
        "weeks_high": 34,
        "quote": "Wire in Duct, AL, 15kV, 1/0 Solid, 1/C",
        "source_locator": "RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / CME",
        "quoted_cell": "32-34",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / CME",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2247-wesco-cme",
      "name": "WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "30–32 weeks for WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "30–32 weeks",
        "weeks_low": 30,
        "weeks_high": 32,
        "quote": "Wire, AL, 15kV, 1/0 Solid, 1/C, Jacketed",
        "source_locator": "RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / CME",
        "quoted_cell": "30-32",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / CME",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-11042-wesco-cme",
      "name": "WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "34–36 weeks for WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "34–36 weeks",
        "weeks_low": 34,
        "weeks_high": 36,
        "quote": "Wire, AL, 15 kV, 4/0 Stranded, 1/C, Jacketed 220m",
        "source_locator": "RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / CME",
        "quoted_cell": "34-36",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / CME",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-16294-wesco-cme",
      "name": "WESCO / CME — 15 kV 750 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "26–28 weeks for WESCO / CME — 15 kV 750 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / CME — 15 kV 750 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "26–28 weeks",
        "weeks_low": 26,
        "weeks_high": 28,
        "quote": "Wire, AL, 15 kV, 750 Stranded, 1/C Jacketed 220m",
        "source_locator": "RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / CME",
        "quoted_cell": "26-28",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / CME",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2246-wesco-ls",
      "name": "WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "26 weeks for WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "26 weeks",
        "weeks_low": 26,
        "weeks_high": 26,
        "quote": "Wire in Duct, AL, 15kV, 1/0 Solid, 1/C",
        "source_locator": "RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / LS Cable",
        "quoted_cell": "26",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "26 to under 52 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / LS Cable",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-2247-wesco-ls",
      "name": "WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "22 weeks for WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "22 weeks",
        "weeks_low": 22,
        "weeks_high": 22,
        "quote": "Wire, AL, 15kV, 1/0 Solid, 1/C, Jacketed",
        "source_locator": "RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / LS Cable",
        "quoted_cell": "22",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / LS Cable",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-11042-wesco-ls",
      "name": "WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "22 weeks for WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "22 weeks",
        "weeks_low": 22,
        "weeks_high": 22,
        "quote": "Wire, AL, 15 kV, 4/0 Stranded, 1/C, Jacketed 220m",
        "source_locator": "RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / LS Cable",
        "quoted_cell": "22",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / LS Cable",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "rochester-16294-wesco-ls",
      "name": "WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable",
      "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
      "summary": "22 weeks for WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable. Rochester Public Utilities reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-01-30",
        "category": "MV cable",
        "specification": "WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable",
        "publisher": "Rochester Public Utilities",
        "basis": "Public bid",
        "clock": "Bid lead time",
        "duration": "22 weeks",
        "weeks_low": 22,
        "weeks_high": 22,
        "quote": "Wire, AL, 15 kV, 750 Stranded, 1/C Jacketed 220m",
        "source_locator": "RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / LS Cable",
        "quoted_cell": "22",
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "12 to under 26 weeks",
        "range_width": 0,
        "duration_type": "Single duration"
      },
      "sources": [
        {
          "url": "https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18",
          "title": "Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / LS Cable",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    },
    {
      "id": "concord-wesco-15kv",
      "name": "WESCO 1/0 15 kV primary cable, 24,000 ft",
      "url": "https://concordnc.gov/Portals/0/Concord/Departments/Clerk/Council%20Agenda/50485/02-12-2026%20Agenda11111.pdf?ver=8NPMY8EgVJcsOyNjxiVYsA%3D%3D#page=6",
      "summary": "8–10 weeks for WESCO 1/0 15 kV primary cable, 24,000 ft. City of Concord, North Carolina reports this as public bid evidence.",
      "tags": [
        "MV cable"
      ],
      "fields": {
        "period": "2026-02-12",
        "category": "MV cable",
        "specification": "WESCO 1/0 15 kV primary cable, 24,000 ft",
        "publisher": "City of Concord, North Carolina",
        "basis": "Public bid",
        "clock": "Estimated delivery lead",
        "duration": "8–10 weeks",
        "weeks_low": 8,
        "weeks_high": 10,
        "quote": "The estimated lead time of 8 to 10 weeks is exceptionally good",
        "source_locator": "Council agenda, electrical cable purchase",
        "quoted_cell": null,
        "product_family": "Medium-voltage cable",
        "technical_excerpt": "Medium Voltage Cables 2.4kV and above",
        "lead_band": "4 to under 12 weeks",
        "range_width": 2,
        "duration_type": "Bounded range"
      },
      "sources": [
        {
          "url": "https://concordnc.gov/Portals/0/Concord/Departments/Clerk/Council%20Agenda/50485/02-12-2026%20Agenda11111.pdf?ver=8NPMY8EgVJcsOyNjxiVYsA%3D%3D#page=6",
          "title": "City of Concord, North Carolina · Council agenda, electrical cable purchase",
          "accessed": "2026-11-28",
          "fields": [
            "period",
            "category",
            "specification",
            "publisher",
            "basis",
            "clock",
            "duration",
            "weeks_low",
            "weeks_high",
            "quote",
            "source_locator",
            "quoted_cell",
            "lead_band",
            "range_width",
            "duration_type"
          ]
        },
        {
          "url": "https://www.okonite.com/product-catalog",
          "title": "Okonite cable class catalog",
          "accessed": "2026-11-28",
          "fields": [
            "product_family",
            "technical_excerpt"
          ]
        }
      ],
      "verifiedAt": "2026-11-28"
    }
  ]
}