title: "Industrial Lead Times | Public Bids and Delivery Readings"
description: "Track industrial lead times for castings, forgings, motors, MV cable, valves and more. Compare dated public bids, project deliveries and factory estimates."
image: "https://industrialleadtimes.com/og.jpg"
url: "https://industrialleadtimes.com/"
last_updated: "2026-11-28"
---

> Site index for agents: https://industrialleadtimes.com/llms.txt

# Industrial lead times

Find the long-lead part before it sets your schedule.

Rochester Public Utilities recorded [22–36 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18) across its January 2026 bids for four 15 kV cable specifications. Albertville’s domestic 36-inch butterfly valve quote was [30–38 weeks](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2) in its May 2026 filing. Compare dated bids, reported deliveries and factory estimates, with a source excerpt for each reading.

## Public readings [73](https://industrialleadtimes.com/data/)

[CSV](https://industrialleadtimes.com/data.csv) [JSON](https://industrialleadtimes.com/data.json) [Methodology](https://industrialleadtimes.com/methodology/)

| Name | Category | Reading period | Weeks from | Lead time as stated | Reading type | Publisher | Verified |
| --- | --- | --- | --- | --- | --- | --- | --- |
| [665 mm forged steel disc for Flender](https://industrialleadtimes.com/flender-perforated-disc-actual/) | Forgings | 2026-09-14 | 4[1](https://siderforgerossi.com/fast-track-flender-project/ "Source: Siderforgerossi Group · Flender case study (accessed 2026-11-28)") | 4 weeks | Reported delivery | Siderforgerossi Group | 2026-11-28 |
| [665 mm forged steel disc for Flender, standard](https://industrialleadtimes.com/flender-perforated-disc-standard/) | Forgings | 2026-09-14 | 8[1](https://siderforgerossi.com/fast-track-flender-project/ "Source: Siderforgerossi Group · Flender case study (accessed 2026-11-28)") | 8 weeks | Supplier benchmark | Siderforgerossi Group | 2026-11-28 |
| [Medium- and low-voltage switchgear](https://industrialleadtimes.com/skanska-switchgear-fall-2026/) | Switchgear | 2026-Fall | 52[1](https://interactive.usa.skanska.com/fall-2026-construction-market-trends/supply-chain "Source: Skanska USA Building · Fall 2026, Electrical (accessed 2026-11-28)") | 52+ weeks | Market report | Skanska USA Building | 2026-11-28 |
| [Nonstandard imperial-shaft gearmotor](https://industrialleadtimes.com/acorn-imperial-shaft-gearmotor/) | Motors | 2026-07-13 | 4[1](https://www.acorn-ind.co.uk/insight/how-a-24-hour-gearmotor-repair-prevented-677-million-in-downtime/ "Source: ACORN Industrial Services · Case study, The Challenge (accessed 2026-11-28)") | 4+ weeks | Supplier estimate | ACORN Industrial Services | 2026-11-28 |
| [Alternate domestic 36-inch butterfly valve, first quote](https://industrialleadtimes.com/albertville-domestic-alternate-a/) | Valves | 2026-05-04 | 46[1](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2 "Source: Municipal Utilities Board of Albertville · Waiver request, first alternate domestic quote (accessed 2026-11-28)") | 46 weeks | Public bid | Municipal Utilities Board of Albertville | 2026-11-28 |
| [Alternate domestic 36-inch butterfly valve, second quote](https://industrialleadtimes.com/albertville-domestic-alternate-b/) | Valves | 2026-05-04 | 30[1](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2 "Source: Municipal Utilities Board of Albertville · Waiver request, second alternate domestic quote (accessed 2026-11-28)") | 30–36 weeks | Public bid | Municipal Utilities Board of Albertville | 2026-11-28 |
| [Alternate domestic 36-inch butterfly valve, third quote](https://industrialleadtimes.com/albertville-domestic-alternate-c/) | Valves | 2026-05-04 | 30[1](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2 "Source: Municipal Utilities Board of Albertville · Waiver request, third alternate domestic quote (accessed 2026-11-28)") | 30–36 weeks | Public bid | Municipal Utilities Board of Albertville | 2026-11-28 |
| [Domestic 36-inch ductile-iron butterfly valve](https://industrialleadtimes.com/albertville-domestic-butterfly/) | Valves | 2026-05-04 | 30[1](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2 "Source: Municipal Utilities Board of Albertville · Waiver request, domestic column, lead-time table (accessed 2026-11-28)") | 30–38 weeks | Public bid | Municipal Utilities Board of Albertville | 2026-11-28 |
| [Imported 36-inch ductile-iron butterfly valve](https://industrialleadtimes.com/albertville-imported-butterfly/) | Valves | 2026-05-04 | 6[1](https://www.epa.gov/system/files/documents/2026-06/municipal-utilities-board-albertville-al-butterfly-valve-waiver-request.pdf#page=2 "Source: Municipal Utilities Board of Albertville · Waiver request, foreign column, lead-time table (accessed 2026-11-28)") | 6–8 weeks | Public bid | Municipal Utilities Board of Albertville | 2026-11-28 |
| [Steel casting plant backlog after sharp demand declines](https://industrialleadtimes.com/sfsa-steel-plant-downturn-backlog/) | Castings | 2026-03-23 | 6[1](https://www.sfsa.org/sfsa-casteel-reporter-march-2026/ "Source: Steel Founders’ Society of America · Figure 2 commentary (accessed 2026-11-28)") | 6–8 weeks | Backlog | Steel Founders’ Society of America | 2026-11-28 |
| [Steel casting plant backlog in normal conditions](https://industrialleadtimes.com/sfsa-steel-plant-normal-backlog/) | Castings | 2026-03-23 | 8[1](https://www.sfsa.org/sfsa-casteel-reporter-march-2026/ "Source: Steel Founders’ Society of America · Figure 2 commentary (accessed 2026-11-28)") | 8–10 weeks | Backlog | Steel Founders’ Society of America | 2026-11-28 |
| [WESCO 1/0 15 kV primary cable, 24,000 ft](https://industrialleadtimes.com/concord-wesco-15kv/) | MV cable | 2026-02-12 | 8[1](https://concordnc.gov/Portals/0/Concord/Departments/Clerk/Council%20Agenda/50485/02-12-2026%20Agenda11111.pdf?ver=8NPMY8EgVJcsOyNjxiVYsA%3D%3D#page=6 "Source: City of Concord, North Carolina · Council agenda, electrical cable purchase (accessed 2026-11-28)") | 8–10 weeks | Public bid | City of Concord, North Carolina | 2026-11-28 |
| [Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-border-states/) | MV cable | 2026-01-30 | 30[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · Border States / Prysmian (accessed 2026-11-28)") | 30–32 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-border-states/) | MV cable | 2026-01-30 | 24[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · Border States / Prysmian (accessed 2026-11-28)") | 24–26 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-border-states/) | MV cable | 2026-01-30 | 24[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · Border States / Prysmian (accessed 2026-11-28)") | 24–26 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-border-states/) | MV cable | 2026-01-30 | 24[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · Border States / Prysmian (accessed 2026-11-28)") | 24–26 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-irby/) | MV cable | 2026-01-30 | 32[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · IRBY / Okonite (accessed 2026-11-28)") | 32–34 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-irby/) | MV cable | 2026-01-30 | 30[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · IRBY / Okonite (accessed 2026-11-28)") | 30–32 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-irby/) | MV cable | 2026-01-30 | 34[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · IRBY / Okonite (accessed 2026-11-28)") | 34–36 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-irby/) | MV cable | 2026-01-30 | 26[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · IRBY / Okonite (accessed 2026-11-28)") | 26–28 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-resco/) | MV cable | 2026-01-30 | 31[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · RESCO / Prysmian (accessed 2026-11-28)") | 31–33 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-resco/) | MV cable | 2026-01-30 | 25[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · RESCO / Prysmian (accessed 2026-11-28)") | 25–27 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-resco/) | MV cable | 2026-01-30 | 25[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · RESCO / Prysmian (accessed 2026-11-28)") | 25–27 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-resco/) | MV cable | 2026-01-30 | 25[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · RESCO / Prysmian (accessed 2026-11-28)") | 25–27 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / CME — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-wesco-cme/) | MV cable | 2026-01-30 | 32[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / CME (accessed 2026-11-28)") | 32–34 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-wesco-cme/) | MV cable | 2026-01-30 | 30[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / CME (accessed 2026-11-28)") | 30–32 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-wesco-cme/) | MV cable | 2026-01-30 | 34[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / CME (accessed 2026-11-28)") | 34–36 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / CME — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-wesco-cme/) | MV cable | 2026-01-30 | 26[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / CME (accessed 2026-11-28)") | 26–28 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-wesco-ls/) | MV cable | 2026-01-30 | 26[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 1 · stock 2246 · requested 27,000 ft · WESCO / LS Cable (accessed 2026-11-28)") | 26 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-wesco-ls/) | MV cable | 2026-01-30 | 22[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 2 · stock 2247 · requested 99,900 ft · WESCO / LS Cable (accessed 2026-11-28)") | 22 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-wesco-ls/) | MV cable | 2026-01-30 | 22[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 3 · stock 11042 · requested 10,000 ft · WESCO / LS Cable (accessed 2026-11-28)") | 22 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-wesco-ls/) | MV cable | 2026-01-30 | 22[1](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18 "Source: Rochester Public Utilities · RPU item 4 · stock 16294 · requested 66,000 ft · WESCO / LS Cable (accessed 2026-11-28)") | 22 weeks | Public bid | Rochester Public Utilities | 2026-11-28 |
| [Air-cooled chillers](https://industrialleadtimes.com/gilbane-air-chillers/) | HVAC equipment | 2026-Q1 | 14[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 14–23 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Commercial-grade air handling units](https://industrialleadtimes.com/gilbane-commercial-ahu/) | HVAC equipment | 2026-Q1 | 16[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 16–20 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Custom air handling units](https://industrialleadtimes.com/gilbane-custom-ahu/) | HVAC equipment | 2026-Q1 | 20[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 20–33 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Low-voltage switchgear](https://industrialleadtimes.com/gilbane-lv-switchgear-q1-2026/) | Switchgear | 2026-Q1 | 32[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table, Switchgear LV (accessed 2026-11-28)") | 32–54 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Medium-voltage switchgear](https://industrialleadtimes.com/gilbane-mv-switchgear-q1-2026/) | Switchgear | 2026-Q1 | 49[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table, Switchgear MV (accessed 2026-11-28)") | 49–82 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Rooftop HVAC units above 50 tons](https://industrialleadtimes.com/gilbane-rooftop-over-50/) | HVAC equipment | 2026-Q1 | 13[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 13–22 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Rooftop HVAC units below 50 tons](https://industrialleadtimes.com/gilbane-rooftop-under-50/) | HVAC equipment | 2026-Q1 | 12[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 12–18 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Water-cooled chillers above 1,000 tons](https://industrialleadtimes.com/gilbane-water-chillers-over-1000/) | HVAC equipment | 2026-Q1 | 28[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 28–44 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Water-cooled chillers below 1,000 tons](https://industrialleadtimes.com/gilbane-water-chillers-under-1000/) | HVAC equipment | 2026-Q1 | 18[1](https://info.gilbaneco.com/hubfs/Q1%202026%20Market%20Conditions%20Report_Print.pdf#page=21 "Source: Gilbane Building Company · Q1 2026 lead-time table (accessed 2026-11-28)") | 18–30 weeks | Market report | Gilbane Building Company | 2026-11-28 |
| [Price, Utah, 16 × 4 ft box culvert](https://industrialleadtimes.com/geneva-carbon-ave-box-culvert/) | Precast | 2025-10-23 | 6[1](https://www.utah.gov/pmn/files/1341541.pdf#page=2 "Source: Geneva Pipe Company · Quote 56708, Carbon Ave canal crossing (accessed 2026-11-28)") | 6–7 weeks | Public bid | Geneva Pipe Company | 2026-11-28 |
| [Cold Springs Road concrete box culvert](https://industrialleadtimes.com/west-point-cold-springs-box-culvert/) | Precast | 2025-10-07 | 8[1](https://www.utah.gov/pmn/files/1333141.pdf#page=48 "Source: City of West Point, Utah · City Council staff report, p. 48 (accessed 2026-11-28)") | 8 weeks | Buyer estimate | City of West Point, Utah | 2026-11-28 |
| [Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV](https://industrialleadtimes.com/portland-okonite-500-mcm/) | MV cable | 2025-08-04 | 8[1](https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44 "Source: City of Portland, Michigan · Substation memo, Okonite row (accessed 2026-11-28)") | 8–10 weeks | Public bid | City of Portland, Michigan | 2026-11-28 |
| [RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV](https://industrialleadtimes.com/portland-kerite-500-mcm/) | MV cable | 2025-08-04 | 10[1](https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44 "Source: City of Portland, Michigan · Substation memo, Kerite row (accessed 2026-11-28)") | 10 weeks | Public bid | City of Portland, Michigan | 2026-11-28 |
| [Bonfiglioli motor with nonstandard flange](https://industrialleadtimes.com/acorn-bonfiglioli-flange-replacement/) | Motors | 2025-07-22 | 8[1](https://www.acorn-ind.co.uk/insight/fast-response-to-motor-failure-saves-production/ "Source: ACORN Industrial Services · Case study, Quick facts (accessed 2026-11-28)") | 8 weeks | Supplier estimate | ACORN Industrial Services | 2026-11-28 |
| [5 hp IE3 premium-efficiency motor](https://industrialleadtimes.com/calnext-5hp-ie3/) | Motors | 2025-01-02 | 2[1](https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19 "Source: CalNEXT · Final report, p. 13 (accessed 2026-11-28)") | 2 weeks | Supplier benchmark | CalNEXT | 2026-11-28 |
| [Commonly stocked 1–20 hp motors](https://industrialleadtimes.com/calnext-stocked-motors/) | Motors | 2025-01-02 | 1[1](https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19 "Source: CalNEXT · Final report, p. 13 (accessed 2026-11-28)") | 1–2 weeks | Pilot benchmark | CalNEXT | 2026-11-28 |
| [Custom-order advanced motor](https://industrialleadtimes.com/calnext-custom-motor/) | Motors | 2025-01-02 | 6[1](https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19 "Source: CalNEXT · Final report, p. 13 (accessed 2026-11-28)") | 6 weeks | Reported wait | CalNEXT | 2026-11-28 |
| [IE4 motors from surveyed manufacturer](https://industrialleadtimes.com/calnext-ie4/) | Motors | 2025-01-02 | 2[1](https://calnext.com/wp-content/uploads/2025/01/ET23SWE0068_Advanced-Motors-Channel-Partner-Support-and-Measure-Package-Development_Final-Report.pdf#page=19 "Source: CalNEXT · Final report, p. 13 (accessed 2026-11-28)") | 2–4 weeks | Supplier benchmark | CalNEXT | 2026-11-28 |
| [Large nuclear forgings](https://industrialleadtimes.com/doe-large-nuclear-forgings/) | Forgings | 2024-02 | 104.4[1](https://www.energy.gov/sites/default/files/2024-02/near-net-shape-workshop-report-2024.pdf#page=36 "Source: US Department of Energy · Workshop breakout group, PDF page 36 (accessed 2026-11-28)") | 24–48 months | Workshop estimate | US Department of Energy | 2026-11-28 |
| [Atomac AKH2 PFA 2-inch ductile-iron ball valve](https://industrialleadtimes.com/flowserve-atomac-akh2-2-inch/) | Valves | 2024-01-22 | 4[1](https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf "Source: Flowserve · CVO table, Atomac lined ball valves (accessed 2026-11-28)") | 4 weeks | Factory estimate | Flowserve | 2026-11-28 |
| [Atomac AKH2 PFA 4-inch ductile-iron ball valve](https://industrialleadtimes.com/flowserve-atomac-akh2-4-inch/) | Valves | 2024-01-22 | 12[1](https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf "Source: Flowserve · CVO table, Atomac lined ball valves (accessed 2026-11-28)") | 12 weeks | Factory estimate | Flowserve | 2026-11-28 |
| [Atomac AKH2A PFA 4-inch ductile-iron ball valve](https://industrialleadtimes.com/flowserve-atomac-akh2a-4-inch/) | Valves | 2024-01-22 | 18[1](https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf "Source: Flowserve · CVO table, Atomac lined ball valves (accessed 2026-11-28)") | 18 weeks | Factory estimate | Flowserve | 2026-11-28 |
| [Durco BTV 2–12-inch TFE-lined butterfly valves](https://industrialleadtimes.com/flowserve-durco-btv-tfe/) | Valves | 2024-01-22 | 18[1](https://preprodflowserve.bigmachines.com/bmfsweb/preprodflowserve/image/CVO_Downloads/FLS_CVO_leadtime_charts.pdf "Source: Flowserve · CVO table, Durco plug and butterfly valves (accessed 2026-11-28)") | 18 weeks | Factory estimate | Flowserve | 2026-11-28 |
| [16-inch metal-seated ball valve via TIPS contract](https://industrialleadtimes.com/georgetown-16-inch-ball-commitment/) | Valves | 2023-10-12 | 32[1](https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf "Source: City of Georgetown, Texas · Parkside–Round Rock interconnect (accessed 2026-11-28)") | 32–36 weeks | Delivery commitment | City of Georgetown, Texas | 2026-11-28 |
| [Municipal Valve 16-inch metal-seated ball valve](https://industrialleadtimes.com/georgetown-municipal-16-inch-ball/) | Valves | 2023-10-12 | 40[1](https://d2kbkoa27fdvtw.cloudfront.net/georgetown/3262b069f83b761f31ecd02a8e1c63250.pdf "Source: City of Georgetown, Texas · Parkside–Round Rock interconnect (accessed 2026-11-28)") | 40–44 weeks | Public bid | City of Georgetown, Texas | 2026-11-28 |
| [Medium-voltage cable](https://industrialleadtimes.com/skanska-mv-cable-spring-2023/) | MV cable | 2023-Spring | 30[1](https://view.ceros.com/skanska/skanska-construction-trends-spring-23/p/7 "Source: Skanska USA Building · Spring 2023, Electrical (accessed 2026-11-28)") | 30–45 weeks | Market report | Skanska USA Building | 2026-11-28 |
| [Main water injection valve, expedited delivery](https://industrialleadtimes.com/severn-replacement-valve-delivery/) | Valves | 2022-11-22 | 20[1](https://www.severnvalve.com/severn-exceeds-expectations/ "Source: Severn · Replacement case study (accessed 2026-11-28)") | 20 weeks | Reported delivery | Severn | 2026-11-28 |
| [Main water injection valve, standard replacement](https://industrialleadtimes.com/severn-replacement-valve-standard/) | Valves | 2022-11-22 | 30[1](https://www.severnvalve.com/severn-exceeds-expectations/ "Source: Severn · Replacement case study (accessed 2026-11-28)") | 30 weeks | Supplier benchmark | Severn | 2026-11-28 |
| [Water injection valve trim, expedited delivery](https://industrialleadtimes.com/severn-trim-delivery/) | Valves | 2022-11-22 | 12[1](https://www.severnvalve.com/severn-exceeds-expectations/ "Source: Severn · Replacement case study (accessed 2026-11-28)") | 12 weeks | Reported delivery | Severn | 2026-11-28 |
| [Water injection valve trim, standard lead](https://industrialleadtimes.com/severn-trim-standard/) | Valves | 2022-11-22 | 22[1](https://www.severnvalve.com/severn-exceeds-expectations/ "Source: Severn · Replacement case study (accessed 2026-11-28)") | 22 weeks | Supplier benchmark | Severn | 2026-11-28 |
| [Medium-voltage switchgear](https://industrialleadtimes.com/skanska-mv-switchgear-summer-2022/) | Switchgear | 2022-Summer | 18[1](https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7 "Source: Skanska USA Building · Summer 2022, Electrical (accessed 2026-11-28)") | 18–24 weeks | Market report | Skanska USA Building | 2026-11-28 |
| [Nonstock 5–15 kV cable](https://industrialleadtimes.com/skanska-5-to-15kv-summer-2022/) | MV cable | 2022-Summer | 14[1](https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7 "Source: Skanska USA Building · Summer 2022, Electrical (accessed 2026-11-28)") | 14–20 weeks | Market report | Skanska USA Building | 2026-11-28 |
| [McCann Concrete Products 8 × 6 ft box culvert sections](https://industrialleadtimes.com/lebanon-mccann-box-culvert/) | Precast | 2022-05-17 | 13.4[1](https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3 "Source: City of Lebanon, Missouri · ITB ST-08-220517-F-652, Exhibit A (accessed 2026-11-28)") | 94 days | Public bid | City of Lebanon, Missouri | 2026-11-28 |
| [Scurlock Industries box culvert bid, 291 linear ft](https://industrialleadtimes.com/lebanon-scurlock-box-culvert/) | Precast | 2022-05-17 | 14[1](https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3 "Source: City of Lebanon, Missouri · ITB ST-08-220517-F-652, Exhibit A (accessed 2026-11-28)") | 14–20 weeks | Public bid | City of Lebanon, Missouri | 2026-11-28 |
| [Volume purchase of 5 kV cable](https://industrialleadtimes.com/skanska-5kv-spring-2022/) | MV cable | 2022-Spring | 20[1](https://interactive.usa.skanska.com/skanska-construction-trends-spring-2022/p/5 "Source: Skanska USA Building · Spring 2022, Electrical (accessed 2026-11-28)") | 20–28 weeks | Market report | Skanska USA Building | 2026-11-28 |
| [Foundry backlogs in 2021–2022](https://industrialleadtimes.com/state-line-casting-backlogs-2021-22/) | Castings | 2021–2022 | 20[1](https://www.slfcastings.com/switching-foundries-backlogs/ "Source: State Line Foundries · September 27, 2023 interview (accessed 2026-11-28)") | 20+ weeks | Backlog | State Line Foundries | 2026-11-28 |
| [Reverse-engineered high-strength steel castings](https://industrialleadtimes.com/cti-high-strength-steel-castings/) | Castings | 2016-08-12 | 3[1](https://www.foundrymag.com/molds-cores/article/21928864/metalcaster-adopts-3dp-keeps-its-focus-on-casting "Source: Foundry Management & Technology · Casting Technologies International case (accessed 2026-11-28)") | 3 weeks | Reported production | Foundry Management & Technology | 2026-11-28 |
| [Steel casting best-practice example](https://industrialleadtimes.com/steel-best-practice-roadmap/) | Castings | 1998-01 | 4[1](https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31 "Source: Cast Metal Coalition · Lead time (accessed 2026-11-28)") | 4 weeks | Industry benchmark | Cast Metal Coalition | 2026-11-28 |
| [Steel casting procurement](https://industrialleadtimes.com/steel-procurement-roadmap/) | Castings | 1998-01 | 20[1](https://www.energy.gov/sites/prod/files/2013/11/f4/roadmap.pdf#page=31 "Source: Cast Metal Coalition · Lead time (accessed 2026-11-28)") | 20–40 weeks | Industry benchmark | Cast Metal Coalition | 2026-11-28 |
| [New forging orders in the US industry survey](https://industrialleadtimes.com/commerce-new-forging-orders-1992/) | Forgings | 1992-12 | 39.3[1](https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9 "Source: US Department of Commerce · Executive summary, printed page v (accessed 2026-11-28)") | 39.3 weeks | Historical survey average | US Department of Commerce | 2026-11-28 |
| [Repeat forging orders in the US industry survey](https://industrialleadtimes.com/commerce-repeat-forging-orders-1992/) | Forgings | 1992-12 | 15.4[1](https://www.bis.gov/media/documents/u.s.-forging-industry-may-8.pdf#page=9 "Source: US Department of Commerce · Executive summary, printed page v (accessed 2026-11-28)") | 15.4 weeks | Historical survey average | US Department of Commerce | 2026-11-28 |

**Weeks in the queue** Selected public readings

*   [Motors](https://industrialleadtimes.com/indexes/motors/) [1–2](https://industrialleadtimes.com/calnext-stocked-motors/ "Commonly stocked 1–20 hp motors · 2025-01-02")
*   [Forgings](https://industrialleadtimes.com/indexes/forgings/) [4](https://industrialleadtimes.com/flender-perforated-disc-actual/ "665 mm forged steel disc for Flender · 2026-09-14")
*   [Precast](https://industrialleadtimes.com/indexes/precast/) [6–7](https://industrialleadtimes.com/geneva-carbon-ave-box-culvert/ "Price, Utah, 16 × 4 ft box culvert · 2025-10-23")
*   [MV cable](https://industrialleadtimes.com/indexes/mv-cable/) [8–10](https://industrialleadtimes.com/concord-wesco-15kv/ "WESCO 1/0 15 kV primary cable, 24,000 ft · 2026-02-12")
*   [Castings](https://industrialleadtimes.com/indexes/castings/) [20–40](https://industrialleadtimes.com/steel-procurement-roadmap/ "Steel casting procurement · 1998-01")
*   [Valves](https://industrialleadtimes.com/indexes/valves/) [30–38](https://industrialleadtimes.com/albertville-domestic-butterfly/ "Domestic 36-inch ductile-iron butterfly valve · 2026-05-04")

## Lead times by category

*   [Castings](https://industrialleadtimes.com/indexes/castings/)
*   [Forgings](https://industrialleadtimes.com/indexes/forgings/)
*   [Motors](https://industrialleadtimes.com/indexes/motors/)
*   [MV cable](https://industrialleadtimes.com/indexes/mv-cable/)
*   [Valves](https://industrialleadtimes.com/indexes/valves/)
*   [Precast](https://industrialleadtimes.com/indexes/precast/)
*   [Switchgear](https://industrialleadtimes.com/indexes/switchgear/)
*   [HVAC equipment](https://industrialleadtimes.com/indexes/hvac/)

## Supply the monthly index

Send one fixed-spec shipment estimate each month. Buyers get a benchmark they can put on a schedule.

[Read the specifications and join the panel](https://industrialleadtimes.com/panel/)

## Request quotes

Send the part specification, quantity, delivery ZIP code and deadline to the procurement desk.

Request received by the procurement desk.

If the form fails, email [desk@industrialleadtimes.com](mailto:desk@industrialleadtimes.com) with your brief.

## Lead-time questions

### What kind of lead time does each row show?

Each row gives the source’s clock. A bid records a proposed wait, a delivery records the reported outcome, and backlog measures queued work. Open the reading to see which milestone the publisher used.

### Which readings belong side by side?

Start with the same specification, reading type and start milestone. The Rochester cable rows let you compare separate supplier quotes against the same numbered bid item.

### Where do the monthly index figures come from?

The first monthly figure requires five independent suppliers to quote the same specification. Until that threshold is met, use the dated public readings to plan a purchase.

```json
{"@context":"https://schema.org","@graph":[{"@type":"WebSite","@id":"https://industrialleadtimes.com/#website","name":"Industrial Lead Times","url":"https://industrialleadtimes.com/","description":"Track industrial lead times for castings, forgings, motors, MV cable, valves and more. Compare dated public bids, project deliveries and factory estimates.","inLanguage":"en","publisher":{"@id":"https://industrialleadtimes.com/#organization"}},{"@type":"Organization","@id":"https://industrialleadtimes.com/#organization","name":"Industrial Lead Times","url":"https://industrialleadtimes.com/","email":"desk@industrialleadtimes.com"},{"@type":"FAQPage","mainEntity":[{"@type":"Question","name":"What kind of lead time does each row show?","acceptedAnswer":{"@type":"Answer","text":"Each row gives the source’s clock. A bid records a proposed wait, a delivery records the reported outcome, and backlog measures queued work. Open the reading to see which milestone the publisher used."}},{"@type":"Question","name":"Which readings belong side by side?","acceptedAnswer":{"@type":"Answer","text":"Start with the same specification, reading type and start milestone. The Rochester cable rows let you compare separate supplier quotes against the same numbered bid item."}},{"@type":"Question","name":"Where do the monthly index figures come from?","acceptedAnswer":{"@type":"Answer","text":"The first monthly figure requires five independent suppliers to quote the same specification. Until that threshold is met, use the dated public readings to plan a purchase."}}]},{"@type":"ItemList","@id":"https://industrialleadtimes.com/#list","name":"Industrial lead times","numberOfItems":73,"itemListOrder":"https://schema.org/ItemListUnordered","itemListElement":[{"@type":"ListItem","position":1,"name":"16-inch metal-seated ball valve via TIPS contract","url":"https://industrialleadtimes.com/georgetown-16-inch-ball-commitment/"},{"@type":"ListItem","position":2,"name":"5 hp IE3 premium-efficiency motor","url":"https://industrialleadtimes.com/calnext-5hp-ie3/"},{"@type":"ListItem","position":3,"name":"665 mm forged steel disc for Flender","url":"https://industrialleadtimes.com/flender-perforated-disc-actual/"},{"@type":"ListItem","position":4,"name":"665 mm forged steel disc for Flender, standard","url":"https://industrialleadtimes.com/flender-perforated-disc-standard/"},{"@type":"ListItem","position":5,"name":"Air-cooled chillers","url":"https://industrialleadtimes.com/gilbane-air-chillers/"},{"@type":"ListItem","position":6,"name":"Alternate domestic 36-inch butterfly valve, first quote","url":"https://industrialleadtimes.com/albertville-domestic-alternate-a/"},{"@type":"ListItem","position":7,"name":"Alternate domestic 36-inch butterfly valve, second quote","url":"https://industrialleadtimes.com/albertville-domestic-alternate-b/"},{"@type":"ListItem","position":8,"name":"Alternate domestic 36-inch butterfly valve, third quote","url":"https://industrialleadtimes.com/albertville-domestic-alternate-c/"},{"@type":"ListItem","position":9,"name":"Atomac AKH2 PFA 2-inch ductile-iron ball valve","url":"https://industrialleadtimes.com/flowserve-atomac-akh2-2-inch/"},{"@type":"ListItem","position":10,"name":"Atomac AKH2 PFA 4-inch ductile-iron ball valve","url":"https://industrialleadtimes.com/flowserve-atomac-akh2-4-inch/"},{"@type":"ListItem","position":11,"name":"Atomac AKH2A PFA 4-inch ductile-iron ball valve","url":"https://industrialleadtimes.com/flowserve-atomac-akh2a-4-inch/"},{"@type":"ListItem","position":12,"name":"Bonfiglioli motor with nonstandard flange","url":"https://industrialleadtimes.com/acorn-bonfiglioli-flange-replacement/"},{"@type":"ListItem","position":13,"name":"Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct","url":"https://industrialleadtimes.com/rochester-2246-border-states/"},{"@type":"ListItem","position":14,"name":"Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-2247-border-states/"},{"@type":"ListItem","position":15,"name":"Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-11042-border-states/"},{"@type":"ListItem","position":16,"name":"Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-16294-border-states/"},{"@type":"ListItem","position":17,"name":"Cold Springs Road concrete box culvert","url":"https://industrialleadtimes.com/west-point-cold-springs-box-culvert/"},{"@type":"ListItem","position":18,"name":"Commercial-grade air handling units","url":"https://industrialleadtimes.com/gilbane-commercial-ahu/"},{"@type":"ListItem","position":19,"name":"Commonly stocked 1–20 hp motors","url":"https://industrialleadtimes.com/calnext-stocked-motors/"},{"@type":"ListItem","position":20,"name":"Custom air handling units","url":"https://industrialleadtimes.com/gilbane-custom-ahu/"},{"@type":"ListItem","position":21,"name":"Custom-order advanced motor","url":"https://industrialleadtimes.com/calnext-custom-motor/"},{"@type":"ListItem","position":22,"name":"Domestic 36-inch ductile-iron butterfly valve","url":"https://industrialleadtimes.com/albertville-domestic-butterfly/"},{"@type":"ListItem","position":23,"name":"Durco BTV 2–12-inch TFE-lined butterfly valves","url":"https://industrialleadtimes.com/flowserve-durco-btv-tfe/"},{"@type":"ListItem","position":24,"name":"Foundry backlogs in 2021–2022","url":"https://industrialleadtimes.com/state-line-casting-backlogs-2021-22/"},{"@type":"ListItem","position":25,"name":"IE4 motors from surveyed manufacturer","url":"https://industrialleadtimes.com/calnext-ie4/"},{"@type":"ListItem","position":26,"name":"Imported 36-inch ductile-iron butterfly valve","url":"https://industrialleadtimes.com/albertville-imported-butterfly/"},{"@type":"ListItem","position":27,"name":"IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct","url":"https://industrialleadtimes.com/rochester-2246-irby/"},{"@type":"ListItem","position":28,"name":"IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-2247-irby/"},{"@type":"ListItem","position":29,"name":"IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-11042-irby/"},{"@type":"ListItem","position":30,"name":"IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-16294-irby/"},{"@type":"ListItem","position":31,"name":"Large nuclear forgings","url":"https://industrialleadtimes.com/doe-large-nuclear-forgings/"},{"@type":"ListItem","position":32,"name":"Low-voltage switchgear","url":"https://industrialleadtimes.com/gilbane-lv-switchgear-q1-2026/"},{"@type":"ListItem","position":33,"name":"Main water injection valve, expedited delivery","url":"https://industrialleadtimes.com/severn-replacement-valve-delivery/"},{"@type":"ListItem","position":34,"name":"Main water injection valve, standard replacement","url":"https://industrialleadtimes.com/severn-replacement-valve-standard/"},{"@type":"ListItem","position":35,"name":"McCann Concrete Products 8 × 6 ft box culvert sections","url":"https://industrialleadtimes.com/lebanon-mccann-box-culvert/"},{"@type":"ListItem","position":36,"name":"Medium- and low-voltage switchgear","url":"https://industrialleadtimes.com/skanska-switchgear-fall-2026/"},{"@type":"ListItem","position":37,"name":"Medium-voltage cable","url":"https://industrialleadtimes.com/skanska-mv-cable-spring-2023/"},{"@type":"ListItem","position":38,"name":"Medium-voltage switchgear","url":"https://industrialleadtimes.com/skanska-mv-switchgear-summer-2022/"},{"@type":"ListItem","position":39,"name":"Medium-voltage switchgear","url":"https://industrialleadtimes.com/gilbane-mv-switchgear-q1-2026/"},{"@type":"ListItem","position":40,"name":"Municipal Valve 16-inch metal-seated ball valve","url":"https://industrialleadtimes.com/georgetown-municipal-16-inch-ball/"},{"@type":"ListItem","position":41,"name":"New forging orders in the US industry survey","url":"https://industrialleadtimes.com/commerce-new-forging-orders-1992/"},{"@type":"ListItem","position":42,"name":"Nonstandard imperial-shaft gearmotor","url":"https://industrialleadtimes.com/acorn-imperial-shaft-gearmotor/"},{"@type":"ListItem","position":43,"name":"Nonstock 5–15 kV cable","url":"https://industrialleadtimes.com/skanska-5-to-15kv-summer-2022/"},{"@type":"ListItem","position":44,"name":"Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV","url":"https://industrialleadtimes.com/portland-okonite-500-mcm/"},{"@type":"ListItem","position":45,"name":"Price, Utah, 16 × 4 ft box culvert","url":"https://industrialleadtimes.com/geneva-carbon-ave-box-culvert/"},{"@type":"ListItem","position":46,"name":"Repeat forging orders in the US industry survey","url":"https://industrialleadtimes.com/commerce-repeat-forging-orders-1992/"},{"@type":"ListItem","position":47,"name":"RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV","url":"https://industrialleadtimes.com/portland-kerite-500-mcm/"},{"@type":"ListItem","position":48,"name":"RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct","url":"https://industrialleadtimes.com/rochester-2246-resco/"},{"@type":"ListItem","position":49,"name":"RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-2247-resco/"},{"@type":"ListItem","position":50,"name":"RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-11042-resco/"},{"@type":"ListItem","position":51,"name":"RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-16294-resco/"},{"@type":"ListItem","position":52,"name":"Reverse-engineered high-strength steel castings","url":"https://industrialleadtimes.com/cti-high-strength-steel-castings/"},{"@type":"ListItem","position":53,"name":"Rooftop HVAC units above 50 tons","url":"https://industrialleadtimes.com/gilbane-rooftop-over-50/"},{"@type":"ListItem","position":54,"name":"Rooftop HVAC units below 50 tons","url":"https://industrialleadtimes.com/gilbane-rooftop-under-50/"},{"@type":"ListItem","position":55,"name":"Scurlock Industries box culvert bid, 291 linear ft","url":"https://industrialleadtimes.com/lebanon-scurlock-box-culvert/"},{"@type":"ListItem","position":56,"name":"Steel casting best-practice example","url":"https://industrialleadtimes.com/steel-best-practice-roadmap/"},{"@type":"ListItem","position":57,"name":"Steel casting plant backlog after sharp demand declines","url":"https://industrialleadtimes.com/sfsa-steel-plant-downturn-backlog/"},{"@type":"ListItem","position":58,"name":"Steel casting plant backlog in normal conditions","url":"https://industrialleadtimes.com/sfsa-steel-plant-normal-backlog/"},{"@type":"ListItem","position":59,"name":"Steel casting procurement","url":"https://industrialleadtimes.com/steel-procurement-roadmap/"},{"@type":"ListItem","position":60,"name":"Volume purchase of 5 kV cable","url":"https://industrialleadtimes.com/skanska-5kv-spring-2022/"},{"@type":"ListItem","position":61,"name":"Water injection valve trim, expedited delivery","url":"https://industrialleadtimes.com/severn-trim-delivery/"},{"@type":"ListItem","position":62,"name":"Water injection valve trim, standard lead","url":"https://industrialleadtimes.com/severn-trim-standard/"},{"@type":"ListItem","position":63,"name":"Water-cooled chillers above 1,000 tons","url":"https://industrialleadtimes.com/gilbane-water-chillers-over-1000/"},{"@type":"ListItem","position":64,"name":"Water-cooled chillers below 1,000 tons","url":"https://industrialleadtimes.com/gilbane-water-chillers-under-1000/"},{"@type":"ListItem","position":65,"name":"WESCO / CME — 15 kV 1/0 solid aluminum cable in duct","url":"https://industrialleadtimes.com/rochester-2246-wesco-cme/"},{"@type":"ListItem","position":66,"name":"WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-2247-wesco-cme/"},{"@type":"ListItem","position":67,"name":"WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-11042-wesco-cme/"},{"@type":"ListItem","position":68,"name":"WESCO / CME — 15 kV 750 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-16294-wesco-cme/"},{"@type":"ListItem","position":69,"name":"WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct","url":"https://industrialleadtimes.com/rochester-2246-wesco-ls/"},{"@type":"ListItem","position":70,"name":"WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-2247-wesco-ls/"},{"@type":"ListItem","position":71,"name":"WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-11042-wesco-ls/"},{"@type":"ListItem","position":72,"name":"WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable","url":"https://industrialleadtimes.com/rochester-16294-wesco-ls/"},{"@type":"ListItem","position":73,"name":"WESCO 1/0 15 kV primary cable, 24,000 ft","url":"https://industrialleadtimes.com/concord-wesco-15kv/"}]},{"@type":"Dataset","@id":"https://industrialleadtimes.com/#dataset","name":"Industrial Lead Times public readings","description":"Track industrial lead times for castings, forgings, motors, MV cable, valves and more. Compare dated public bids, project deliveries and factory estimates.","url":"https://industrialleadtimes.com/","dateModified":"2026-11-28","creator":{"@id":"https://industrialleadtimes.com/#organization"},"isAccessibleForFree":true,"variableMeasured":["Reading period","Category","Scope","Publisher","Reading type","Lead-time basis","Lead time as stated","Weeks from","Weeks to","Source excerpt","Source location","Quoted table value","Technical family","Technical excerpt","Lead-time band","Range width","Duration format"],"size":"73 records","license":"https://creativecommons.org/licenses/by/4.0/","distribution":[{"@type":"DataDownload","encodingFormat":"application/json","contentUrl":"https://industrialleadtimes.com/data.json"},{"@type":"DataDownload","encodingFormat":"text/csv","contentUrl":"https://industrialleadtimes.com/data.csv"}]}]}
```