---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://industrialleadtimes.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "Medium-voltage cable lead times"
description: "Concord, North Carolina, recorded 8–10 weeks for a 24,000-foot order of 1/0 15 kV primary cable in February 2026."
image: "https://industrialleadtimes.com/og.jpg"
url: "https://industrialleadtimes.com/indexes/mv-cable/"
last_updated: "2026-11-28"
---

> Site index for agents: https://industrialleadtimes.com/llms.txt

# Medium-voltage cable lead times

Concord, North Carolina, recorded [8–10 weeks](https://concordnc.gov/Portals/0/Concord/Departments/Clerk/Council%20Agenda/50485/02-12-2026%20Agenda11111.pdf?ver=8NPMY8EgVJcsOyNjxiVYsA%3D%3D#page=6) for a 24,000-foot order of 1/0 15 kV primary cable in February 2026. [Read the evidence](https://industrialleadtimes.com/concord-wesco-15kv/).

## Monthly supplier index

First release pending. Suppliers can submit a shipment estimate for the [fixed specification](https://industrialleadtimes.com/panel/#mv-cable).

## Published readings by period

Use the reading type and clock to match evidence to your purchase.

1.  ### 2026-02
    
    *   [WESCO 1/0 15 kV primary cable, 24,000 ft](https://industrialleadtimes.com/concord-wesco-15kv/) · Public bid · [8–10 weeks](https://concordnc.gov/Portals/0/Concord/Departments/Clerk/Council%20Agenda/50485/02-12-2026%20Agenda11111.pdf?ver=8NPMY8EgVJcsOyNjxiVYsA%3D%3D#page=6)
2.  ### 2026-01
    
    *   [Border States / Prysmian — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-border-states/) · Public bid · [30–32 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [Border States / Prysmian — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-border-states/) · Public bid · [24–26 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [Border States / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-border-states/) · Public bid · [24–26 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [Border States / Prysmian — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-border-states/) · Public bid · [24–26 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [IRBY / Okonite — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-irby/) · Public bid · [32–34 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [IRBY / Okonite — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-irby/) · Public bid · [30–32 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [IRBY / Okonite — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-irby/) · Public bid · [34–36 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [IRBY / Okonite — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-irby/) · Public bid · [26–28 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [RESCO / Prysmian — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-resco/) · Public bid · [31–33 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [RESCO / Prysmian — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-resco/) · Public bid · [25–27 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [RESCO / Prysmian — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-resco/) · Public bid · [25–27 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [RESCO / Prysmian — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-resco/) · Public bid · [25–27 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / CME — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-wesco-cme/) · Public bid · [32–34 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / CME — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-wesco-cme/) · Public bid · [30–32 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / CME — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-wesco-cme/) · Public bid · [34–36 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / CME — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-wesco-cme/) · Public bid · [26–28 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / LS Cable — 15 kV 1/0 solid aluminum cable in duct](https://industrialleadtimes.com/rochester-2246-wesco-ls/) · Public bid · [26 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / LS Cable — 15 kV 1/0 solid jacketed aluminum cable](https://industrialleadtimes.com/rochester-2247-wesco-ls/) · Public bid · [22 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / LS Cable — 15 kV 4/0 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-11042-wesco-ls/) · Public bid · [22 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
    *   [WESCO / LS Cable — 15 kV 750 stranded jacketed aluminum cable](https://industrialleadtimes.com/rochester-16294-wesco-ls/) · Public bid · [22 weeks](https://d3n9y02raazwpg.cloudfront.net/rochestermn/f9c40f30-c642-11f0-a7da-005056a89546-f50ddd73-1307-4d4b-8301-1402d356b22a-1770847045.pdf#page=18)
3.  ### 2025-08
    
    *   [Power Line / Okonite 500 MCM Cu URD MV cable, 15 kV](https://industrialleadtimes.com/portland-okonite-500-mcm/) · Public bid · [8–10 weeks](https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44)
    *   [RESCO / Kerite 500 MCM Cu URD MV cable, 15 kV](https://industrialleadtimes.com/portland-kerite-500-mcm/) · Public bid · [10 weeks](https://www.portland-michigan.org/DocumentCenter/View/5356/20250804-Packet?bidId=#page=44)
4.  ### 2023-Spring
    
    *   [Medium-voltage cable](https://industrialleadtimes.com/skanska-mv-cable-spring-2023/) · Market report · [30–45 weeks](https://view.ceros.com/skanska/skanska-construction-trends-spring-23/p/7)
5.  ### 2022-Summer
    
    *   [Nonstock 5–15 kV cable](https://industrialleadtimes.com/skanska-5-to-15kv-summer-2022/) · Market report · [14–20 weeks](https://interactive.usa.skanska.com/skanska-construction-trends-summer-2022-1/p/7)
6.  ### 2022-Spring
    
    *   [Volume purchase of 5 kV cable](https://industrialleadtimes.com/skanska-5kv-spring-2022/) · Market report · [20–28 weeks](https://interactive.usa.skanska.com/skanska-construction-trends-spring-2022/p/5)

## MV cable buying questions

### How do I compare the Rochester bids fairly?

Match the bid item and stock number first. The source location identifies the line, requested footage and bidder, including the two WESCO manufacturer options.

### What should a medium-voltage cable RFQ include?

Specify voltage class, conductor material and size, insulation, shield, jacket, total footage, reel lengths and requested ship date.

### When does the quote clock start?

Use the timing basis on the bid. When the bid lists only a lead-time column, record the intended start milestone in the purchase order.

## Request quotes

Send the part specification, quantity, delivery ZIP code and deadline to the procurement desk.

Request received by the procurement desk.

If the form fails, email [desk@industrialleadtimes.com](mailto:desk@industrialleadtimes.com) with your brief.

## Browse the indexes

*   [Castings](https://industrialleadtimes.com/indexes/castings/)
*   [Forgings](https://industrialleadtimes.com/indexes/forgings/)
*   [Motors](https://industrialleadtimes.com/indexes/motors/)
*   [MV cable](https://industrialleadtimes.com/indexes/mv-cable/)
*   [Valves](https://industrialleadtimes.com/indexes/valves/)
*   [Precast](https://industrialleadtimes.com/indexes/precast/)
*   [Switchgear](https://industrialleadtimes.com/indexes/switchgear/)
*   [HVAC equipment](https://industrialleadtimes.com/indexes/hvac/)

```json
{"@context":"https://schema.org","@graph":[{"@type":"FAQPage","mainEntity":[{"@type":"Question","name":"How do I compare the Rochester bids fairly?","acceptedAnswer":{"@type":"Answer","text":"Match the bid item and stock number first. The source location identifies the line, requested footage and bidder, including the two WESCO manufacturer options."}},{"@type":"Question","name":"What should a medium-voltage cable RFQ include?","acceptedAnswer":{"@type":"Answer","text":"Specify voltage class, conductor material and size, insulation, shield, jacket, total footage, reel lengths and requested ship date."}},{"@type":"Question","name":"When does the quote clock start?","acceptedAnswer":{"@type":"Answer","text":"Use the timing basis on the bid. When the bid lists only a lead-time column, record the intended start milestone in the purchase order."}}]},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Tracker","item":"https://industrialleadtimes.com/"},{"@type":"ListItem","position":2,"name":"Indexes","item":"https://industrialleadtimes.com/indexes/"},{"@type":"ListItem","position":3,"name":"MV cable","item":"https://industrialleadtimes.com/indexes/mv-cable/"}]}]}
```
