---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://industrialleadtimes.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "Precast box culvert lead times"
description: "Geneva Pipe Company quoted 6–7 weeks after submittal approval for a 16 × 4 ft box culvert in Price, Utah, in October 2025."
image: "https://industrialleadtimes.com/og.jpg"
url: "https://industrialleadtimes.com/indexes/precast/"
last_updated: "2026-11-28"
---

> Site index for agents: https://industrialleadtimes.com/llms.txt

# Precast box culvert lead times

Geneva Pipe Company quoted [6–7 weeks](https://www.utah.gov/pmn/files/1341541.pdf#page=2) after submittal approval for a 16 × 4 ft box culvert in Price, Utah, in October 2025. [Read the evidence](https://industrialleadtimes.com/geneva-carbon-ave-box-culvert/).

## Monthly supplier index

First release pending. Suppliers can submit a shipment estimate for the [fixed specification](https://industrialleadtimes.com/panel/#precast).

## Published readings by period

Use the reading type and clock to match evidence to your purchase.

1.  ### 2025-10
    
    *   [Price, Utah, 16 × 4 ft box culvert](https://industrialleadtimes.com/geneva-carbon-ave-box-culvert/) · Public bid · [6–7 weeks](https://www.utah.gov/pmn/files/1341541.pdf#page=2)
    *   [Cold Springs Road concrete box culvert](https://industrialleadtimes.com/west-point-cold-springs-box-culvert/) · Buyer estimate · [8 weeks](https://www.utah.gov/pmn/files/1333141.pdf#page=48)
2.  ### 2022-05
    
    *   [McCann Concrete Products 8 × 6 ft box culvert sections](https://industrialleadtimes.com/lebanon-mccann-box-culvert/) · Public bid · [94 days](https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3)
    *   [Scurlock Industries box culvert bid, 291 linear ft](https://industrialleadtimes.com/lebanon-scurlock-box-culvert/) · Public bid · [14–20 weeks](https://www.lebanonmissouri.org/DocumentCenter/View/36123/Council-Bill-No-6290--Purchase-Precast-Culvert-for-Kansas-McCann-Concrete-Products#page=3)

## Precast buying questions

### When does the culvert lead time begin?

It begins at the named trigger on the bid. The Geneva reading starts at submittal approval. The Lebanon bids specify an executed contract or award.

### How should I compare two culvert bids?

Match opening, length, loading, total footage, freight scope and starting milestone before comparing the quoted intervals.

### When does the standardized culvert index start?

The first release depends on the panel reaching the published minimum for the fixed culvert order. The project bids below carry their own dimensions and clocks.

## Request quotes

Send the part specification, quantity, delivery ZIP code and deadline to the procurement desk.

Request received by the procurement desk.

If the form fails, email [desk@industrialleadtimes.com](mailto:desk@industrialleadtimes.com) with your brief.

## Browse the indexes

*   [Castings](https://industrialleadtimes.com/indexes/castings/)
*   [Forgings](https://industrialleadtimes.com/indexes/forgings/)
*   [Motors](https://industrialleadtimes.com/indexes/motors/)
*   [MV cable](https://industrialleadtimes.com/indexes/mv-cable/)
*   [Valves](https://industrialleadtimes.com/indexes/valves/)
*   [Precast](https://industrialleadtimes.com/indexes/precast/)
*   [Switchgear](https://industrialleadtimes.com/indexes/switchgear/)
*   [HVAC equipment](https://industrialleadtimes.com/indexes/hvac/)

```json
{"@context":"https://schema.org","@graph":[{"@type":"FAQPage","mainEntity":[{"@type":"Question","name":"When does the culvert lead time begin?","acceptedAnswer":{"@type":"Answer","text":"It begins at the named trigger on the bid. The Geneva reading starts at submittal approval. The Lebanon bids specify an executed contract or award."}},{"@type":"Question","name":"How should I compare two culvert bids?","acceptedAnswer":{"@type":"Answer","text":"Match opening, length, loading, total footage, freight scope and starting milestone before comparing the quoted intervals."}},{"@type":"Question","name":"When does the standardized culvert index start?","acceptedAnswer":{"@type":"Answer","text":"The first release depends on the panel reaching the published minimum for the fixed culvert order. The project bids below carry their own dimensions and clocks."}}]},{"@type":"BreadcrumbList","itemListElement":[{"@type":"ListItem","position":1,"name":"Tracker","item":"https://industrialleadtimes.com/"},{"@type":"ListItem","position":2,"name":"Indexes","item":"https://industrialleadtimes.com/indexes/"},{"@type":"ListItem","position":3,"name":"Precast","item":"https://industrialleadtimes.com/indexes/precast/"}]}]}
```
