---
agent:
  instructions: "Use this search API to find relevant content across this site with keywords or natural-language queries, instead of crawling individual pages. Results are returned in Markdown."
  endpoint: "https://industrialleadtimes.com/.well-known/search?q={query}"
  method: "GET"
  documentation: "https://developers.cloudflare.com/ai-search/how-to/search-for-agents/"
title: "How Industrial Lead Times verifies and groups readings"
description: "See how public bid, supplier, market-report and project evidence is checked, grouped by scope and normalized into weeks."
image: "https://industrialleadtimes.com/og.jpg"
url: "https://industrialleadtimes.com/methodology/"
last_updated: "2026-11-28"
---

> Site index for agents: https://industrialleadtimes.com/llms.txt

# How the tracker is built

[73 public readings](https://industrialleadtimes.com/data/) draw on [33 source documents](https://industrialleadtimes.com/data.json). The latest source review was [28 Nov 2026](https://industrialleadtimes.com/data.json).

## Where a reading comes from

We transcribe public bid schedules, supplier estimates and completed projects from the named publisher. For market research and trade reporting, the row keeps the survey or case-study label. A bid reading is one supplier or option for a defined item on a given date. A project reading keeps the scope and milestone used by its publisher.

## How the sources join

The common key is the normalized product family. Primary records retain the bid item, manufacturer option, product model or project where the document supplies one. A separate technical guide identifies the relevant family and provides a second, identified excerpt. The technical guide supports classification. The bid, project or market publication supplies the dated duration.

## How durations compare

We keep the source unit and show a normalized week count for sorting. Days are divided by seven. Months use the average Gregorian month, and conversions round to a tenth of a week. The duration format distinguishes a single figure, a bounded range and a lower bound with no stated ceiling. The planning band uses the lower bound and range width uses the difference between the two bounds where both are defined.

Match the product, evidence type and start milestone before using a figure. Backlog, factory estimates, accepted schedules and deliveries record different events. Date grouping preserves a year, season or quarter when that is the precision of the source.

## Refresh and monthly release

The public archive takes new dated documents as they become available. The [monthly supplier panel](https://industrialleadtimes.com/panel/#release) uses a separate fixed-spec process and releases only qualifying pooled results. New rounds append to the history so that older quotes keep their original reading dates.

## Corrections

Email [desk@industrialleadtimes.com](mailto:desk@industrialleadtimes.com) with the reading, source page and exact line. We retain each checked document’s URL and access date in the public downloads.
