Cold Springs Road concrete box culvert
“It recently came to our attention that the lead time to purchase the box culvert is about eight weeks”
Reading details
- Reading period
- 2025-10-07
- Publisher
- City of West Point, Utah
- Reading type
- Buyer estimate
- Lead-time basis
- Purchase lead time
- Source location
- City Council staff report, p. 48
- Lead-time band
- 4 to under 12 weeks
- Range width
- 0 weeks
- Duration format
- Single duration
Technical context · Precast concrete drainage structures · NPCA technical overview of box culverts
“Precast concrete box and 3-sided culverts are incredibly versatile”