Medium-voltage switchgear
“medium voltage switchgear lead times are between 18 and 24 weeks.”
Reading details
- Reading period
- 2022-Summer
- Publisher
- Skanska USA Building
- Reading type
- Market report
- Lead-time basis
- Market lead time
- Source location
- Summer 2022, Electrical
- Lead-time band
- 12 to under 26 weeks
- Range width
- 6 weeks
- Duration format
- Bounded range
Technical context · Electrical distribution switching and protection · Eaton distribution switchgear overview
“provides centralized control and protection of medium-voltage power equipment”