Commercial HVAC equipment lead times

Gilbane reported 28–44 weeks in Q1 2026 for water-cooled chillers over 1,000 tons. Read the evidence.

Published readings by period

Use the reading type and clock to match evidence to your purchase.

  1. 2026-Q1

HVAC equipment buying questions

Which chiller readings can I compare?

The Gilbane table separates air-cooled chillers and two water-cooled capacity bands. Pair the band and cooling method with your design before using a duration.

What does the HVAC survey start date represent?

It starts at release of the order or release to fabrication. Track the design and submittal steps independently.

What should a mechanical buyer send for a live schedule?

Send duty and capacity, temperatures, controls, accessories, testing scope and the required on-site date.

Request quotes

Send the part specification, quantity, delivery ZIP code and deadline to the procurement desk.

Request received by the procurement desk.

The desk uses your email and brief to respond. Privacy policy